TDK-Lambda EZA2500W Series Скачать руководство пользователя страница 5

 

- 5 -  

TDK-Lambda 

EZA2500W series 

Quick Manual / Practical (II) 

 

The setting procedure is shown below.

 

 

 

Set the EZA to operation via RS-485 and the address on RS-485 to "0", the 
communication speed to 19.2 kbps

 

Set the terminal voltage on both the grid side and the battery side of the 
EZA to 0 V, and then set as shown in the photo under the DIP switch on 
the back. 

 
 
 
 
 
 
 
 
 

Set the rotary switch on the front panel as shown in the picture below. 

 

 
 
 
 
 
 
 
 
 

 The factory setting is the above setting. 

 

Apply the specified voltage on the grid side and battery side terminals of EZA.  
This operation is unnecessary unless you have operated the DIP switch or rotary 
switch. 

 
 
 
 
 
 
 

 

Start up the PC on which CNVCommCC is installed, and confirm that it can communicate 

with the PC and EZA according to the operation manual of CNVCommCC distributed 
together.

 

Check that communication is possible. 

 Restart the control board. 

 Setting communication conditions for DIP switch and RS-485. 

For details, refer to the 
instruction manual p10 and the 
communication manual p6. 

The control board reads the values of DIP switch 
and rotary switch at restart. 

The control board is also restarted by applying the 
specified voltage to either the battery or grid side. 

Содержание EZA2500W Series

Страница 1: ...ound etc Please stop using it immediately and shut off the product It might lead to fire and electric shock In such cases please contact us Do not attempt repair by you as it is dangerous for the user...

Страница 2: ...ment of usage and perform maintenance Also note that there are cases when EOL products cannot be overhauled Take care not to apply external abnormal voltage to the output Especially applying reverse v...

Страница 3: ...it explains the control by the open collector contact using the external signal connector CN Contents 1 Construction of communication environment with RS 485 2 Operation of Manual CV mode 3 Operation...

Страница 4: ...utput Terminal GND Connected to housing V V The fuse is connected to V from the left CN External Signal Connector DIP SW RS 485 Serial Interface Connector Battery Signal connector DC48V LVDC Terminal...

Страница 5: ...the grid side and battery side terminals of EZA This operation is unnecessary unless you have operated the DIP switch or rotary switch Start up the PC on which CNVCommCC is installed and confirm that...

Страница 6: ...CNVCommCC and confirm that it can communicate with EZA Set the necessary parameters in Manual CV mode Click the Main tab Click READ ALL to display the current values of the EZA parameters Overwrite th...

Страница 7: ...s a specific reason click all the check boxes surrounded by blue dotted lines to enable them and click WRITE Click READ ALL to confirm that the parameters have been changed For the meaning of each par...

Страница 8: ...ging Click Wait to stop the main converter and enter Waiting Click READ to display the current operation status in the lower frame Start EZA Even after clicking Stop the cooling fans will rotate for 3...

Страница 9: ...rrent value on the battery side without the above operation The Manual CV mode is useful when I want to control when charging and discharging In particular the Manual grid CV with battery CC mode seem...

Страница 10: ...art CNVCommCC and confirm that it can communicate with EZA Set the necessary parameters in Automatic grid CV mode Click the Main tab Click READ ALL to display the current values of the EZA parameters...

Страница 11: ...s a specific reason click all the check boxes surrounded by blue dotted lines to enable them and click WRITE Click READ ALL to confirm that the parameters have been changed For the meaning of each par...

Страница 12: ...rotate and start discharging Click Wait to stop the main converter and enter Waiting Click READ to display the current operation status in the lower frame Start EZA Even after clicking Stop the coolin...

Страница 13: ...tons for Autonomy and With batt CC in of the previous operation Perform the operations after above In Automatic grid CV mode EZA judges and switches between charging and discharging so that the grid v...

Страница 14: ...oltage CVB Start CNVCommCC and confirm that it can communicate with EZA Set the necessary parameters in Automatic battery CV mode Click the Main tab Click READ ALL to display the current values of the...

Страница 15: ...s a specific reason click all the check boxes surrounded by blue dotted lines to enable them and click WRITE Click READ ALL to confirm that the parameters have been changed For the meaning of each par...

Страница 16: ...verter and enter Waiting Click READ to display the current operation status in the lower frame In this mode only With batt CC operation is possible Even if the With grid CC radio button is turned on i...

Страница 17: ...ecomes constant so it seems to be used for power exchange between 48VDC bus and 260 400VDC bus However even if a battery is connected to the grid side there is no protection function for preventing ov...

Страница 18: ...on mode with the DIP switch in advance In Manual CV mode using CN set the address on RS 485 to 0 and the communication speed to 19 2kbps Set the terminal voltage on both the grid side and the battery...

Страница 19: ...l ground e g pin 8 EZA starts the main circuit from the Waiting and starts discharging To switch to charging short pin 9 of the external signal connector CN to SG If pin 9 is opened discharging will s...

Страница 20: ...battery side of the EZA to 0 V As shown in the photo below set the DIP switch1 and 3 First and Third from Left on the back to ON Lower In the photo the RS 485 address is set to 0 and the communicatio...

Страница 21: ...mode with the DIP switch in advance In Automatic grid CV mode using CN set the address on RS 485 to 0 and the communication speed to 19 2kbps Set the terminal voltage on both the grid side and the ba...

Страница 22: ...hen pin 9 is shorted to SG charging is performed in Manual battery CV mode When pin 9 is opened charging or discharging starts again in Automatic grid CV mode When pin 7 is opened EZA stops the main c...

Страница 23: ...h the grid side and the battery side of the EZA to 0 V As shown in the photo below set the DIP switch1 and 2 First and Second from Left on the back to ON Lower In the photo the RS 485 address is set t...

Страница 24: ...th the DIP switch in advance In Automatic battery CV mode using CN set the address on RS 485 to 0 and the communication speed to 19 2kbps Set the terminal voltage on both the grid side and the battery...

Страница 25: ...4 and 15 of this manual Short the pin 7 RUN of the external signal connector CN to SG signal ground e g pin 8 EZA starts the main circuit from the Waiting and starts charging or discharging When pin 7...

Страница 26: ...26 TDK Lambda EZA2500W series Quick Manual Practical II...

Отзывы: