![TDK-Lambda EZA2500W Series Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/tdk-lambda/eza2500w-series/eza2500w-series_quick-manual_3942957003.webp)
- 3 -
TDK-Lambda
EZA2500W series
Quick Manual / Practical (II)
Over view of Quick manual Practical Volume II
In Quick Manual Practical Volume II, we will explain the procedure for
actually operating the EZA2500W operation mode explained in Practical
Volume I using the Windows GUI software CNVCommCC distributed by TDK
Lambda.
When operating via RS485 using a PLC (Programmable Logic Controller),
the separate "EZA2500W communication manual" explains character-based
commands and their formats (protocols) that correspond to the
CNVCommCC commands. Please refer to it.
In addition, it explains the control by the open collector contact using the
external signal connector CN.
Contents
1) Construction of communication environment with RS-485
2) Operation of Manual CV mode
3) Operation of Manual grid CV with battery CC mode
4) Operation of Automatic grid CV
5) Operation of Automatic grid CV with battery CC mode
6) Operation of Automatic battery CV mode
7) Operation of Manual CV mode using the external signal
connector CN
8) Operation of Manual grid CV with battery CC mode using
external signal connector CN
9) Operation of Automatic grid CV mode using external signal
connector CN
10) Operation of Automatic grid CV with battery CC mode using
external signal connector CN
11) Operation of Automatic battery CV mode using external signal
connector CN