- 121 -
(8) Extend the lift cylinder rods so that the
inner channel bottom projects the upper
section of the carriage.
(9) Bring the truck close to the carriage side
so that each roller enters inside of the outer
channel.
(10) Contract the lift cylinder rods to lower the
inner channels gradually. Place each roller
of the carriage into the inner channel.
(11) Engage the chain with the sheave and
connect the chain and anchor through the
joint link.
(12) Adjust the height of the carriage. (See
8.2.2.)
Fig. 8.15
Fig. 8.14
Side Roller
Groove for balls
8. LOAD HANDLING SYSTEM
Содержание FB-8 Series
Страница 2: ......
Страница 4: ......
Страница 22: ......
Страница 26: ......
Страница 38: ...NOTE 1 BATTERY 12...
Страница 40: ...14 Fig 2 1 Drive Motor Installation DRIVE UNIT DRIVE AXLE DRIVE MOTOR 2 MOTORS...
Страница 92: ...NOTE 6 STEERING SYSTEM 66...
Страница 106: ...NOTE 6 STEERING SYSTEM 80...
Страница 126: ...100 Remove the oil seal from the front cover Fig 7 28 7 HYDRAULIC SYSTEM...
Страница 150: ...NOTE 8 LOAD HANDLING SYSTEM 124...
Страница 234: ...72 3 TROUBLESHOOTING GUIDE NOTE...
Страница 246: ...84 6 ELECTRIC WIRING NOTE...
Страница 258: ......
Страница 259: ...n m o m Z C F H d o H H M 0 M Z 0 m O m C O R P O R A T I O N T C M...