31
If any damaged or worn parts are found, they must be replaced with new ones.
3- Apply grease or oil in accordance with lubrication points table.
Apply oil to rotating, pivoting part, and sliding parts such as clump pin of power joint.
Apply grease on PTO shaft, PIC shaft, and pine holes of power from the rust.
4-
Paint or apply oil on damaged surface of parts to prevent from the rust.
5- Store the machine in well ventilating indoor.
6- If there is no choice but to keep the machine in outdoor, cove the machine with a plastic sheet.
4. Inspection and Maintenance
Inspection and maintenance should be done regularly to obtain good condition.
Inspect and maintain each pad in accordance with inspection and maintenance table to prevent
from accident by poor maintenance.
Since times, shear bolts, blades and twine are consuming pads, replace worn parts with new
ones
.
Warning
•
Stop the tractor engine and disengage PTO when adjustment of twine binding device is done.
•
Lock stop valve for fixing gate when inspection or adjustment is done at opening gate
(1) Inspection and Maintenance table
Hours
Items for checking
Remedy
After initial 1 hour operation
Looseness of all nuts and bolts
Slackness of roller chains
Tightening
Adjustment in accordance with “5
-
2-1 Tension adjustment of roller
chain.
Содержание SRB-870
Страница 1: ...SRB 870 MINI ROUND BALER INSTRUCTION MANUAL APRIL 2019...
Страница 8: ...8 Basic Parts...
Страница 21: ...21 7 Crank Bar 8 PTO shaft 9 Tension arm pivot 10 Link pivot 11 Gate pivot 12 Roller chain...
Страница 22: ...22...
Страница 43: ...43...