32
Before operation
After operation (or before
operation)
Cleaning up
Wear of pick-up tines
Wear of binding blade
Shear of shear bolt
Twine consumption
Running out of battery cell for
buzzer
Tires air pressure
Looseness and loss of nuts, bolts,
and pins
Abnormal noise or vibration in
driving
Breakage of power safety cover of
roller chain cover
Lubrication to rotating and
moving parts
Adjustment of each parts
Replacement
Replacement
Replacement / Replenishment
Replenishment
Replacement
(Layer-built cell battery 9V; 6F22)
195kPa(2.0kg/cm
2)
Tightening and Replenishment
Remedy in accordance with trouble
Shooting table 6-1
Replacement
Lubrication in accordance 2-3
Lubrication points table
Adjustment in accordance 5-2
Adjustment of each pads
Out of Season
Broken parts
Worn parts
Cleaning up each part
Damaged of painting
Worn pivoting pads or pins
Repair
Replacement with new one
Painting or applying oil
Replacement to new ones
(2) Adjustment for each part
1- Roller chain tension adjustment
Roller chain is elongated by usage little by little. Adjust tension of roller chain for transmitting
the power smoothly.
Since the roller chain is especially elongated by initial usage, adjust tension after initial usage.
2- Adjustment of tension spring
Adjust tension of roller chain on frame on the frame and on gate by adjusting the length of
the tension springs.
The length of spring is mentioned below.
The length of the spring is printed in which is stuck on the machine.
Содержание SRB-870
Страница 1: ...SRB 870 MINI ROUND BALER INSTRUCTION MANUAL APRIL 2019...
Страница 8: ...8 Basic Parts...
Страница 21: ...21 7 Crank Bar 8 PTO shaft 9 Tension arm pivot 10 Link pivot 11 Gate pivot 12 Roller chain...
Страница 22: ...22...
Страница 43: ...43...