5-33
MAINTENANCE
AFTER THE INITIAL 50 HOURS (ONLY FOR NEW MACHINES)
9. Tighten a half more turn after the filter
packing comes in contact with the surface
of installation.
10. Remove the plug (3).
11. Add hydraulic oil up to the middle of the
sight gauge (1).
12. Tighten the plug (3).
Refer to “Inspecting the hydraulic oil tank
level and replenishing” on page 5-22.
Содержание 190100003
Страница 1: ......
Страница 11: ...1 1 SAFETY...
Страница 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Страница 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Страница 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Страница 53: ...2 1 CONTROLS...
Страница 77: ...2 25 MEMO...
Страница 126: ...2 74...
Страница 127: ...3 1 OPERATION...
Страница 155: ...3 29 MEMO...
Страница 158: ...3 32...
Страница 159: ...4 1 TRANSPORT...
Страница 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Страница 166: ...4 8...
Страница 167: ...5 1 MAINTENANCE...
Страница 217: ...5 51 MEMO...
Страница 229: ...5 63 MEMO...
Страница 235: ...5 69 MEMO...
Страница 246: ...5 80...
Страница 247: ...6 1 TROUBLESHOOTING...
Страница 255: ...6 9 MEMO...
Страница 271: ...7 1 SPECIFICATIONS...
Страница 274: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS EQUIPPED WITH A REAR BLADE MACHINE DIMENSIONS EQUIPPED WITH A REAR BLADE...
Страница 276: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS MACHINES WITH AN OUTRIGGER MACHINE DIMENSIONS MACHINES WITH AN OUTRIGGER...
Страница 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Страница 280: ...7 10 MEMO...
Страница 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Страница 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Страница 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Страница 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Страница 286: ...7 16...
Страница 287: ...8 1 OPTIONS...
Страница 303: ...8 17...