3-9
OPERATION
OPERATING THE MACHINE
5. Disengage the locks of the brake pedal
and the parking brake.
6. Travel slowly forward and in reverse
several times.
2. Set the bucket cylinder at the stroke end
and keep it there.
Do not keep this condition for more than
30 seconds.
3. Repeat Step 2 until the bucket operating
speed becomes normal.
Warm-up in cold climates
1. Perform the normal warm-up procedure.
Содержание 190100003
Страница 1: ......
Страница 11: ...1 1 SAFETY...
Страница 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Страница 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Страница 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Страница 53: ...2 1 CONTROLS...
Страница 77: ...2 25 MEMO...
Страница 126: ...2 74...
Страница 127: ...3 1 OPERATION...
Страница 155: ...3 29 MEMO...
Страница 158: ...3 32...
Страница 159: ...4 1 TRANSPORT...
Страница 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Страница 166: ...4 8...
Страница 167: ...5 1 MAINTENANCE...
Страница 217: ...5 51 MEMO...
Страница 229: ...5 63 MEMO...
Страница 235: ...5 69 MEMO...
Страница 246: ...5 80...
Страница 247: ...6 1 TROUBLESHOOTING...
Страница 255: ...6 9 MEMO...
Страница 271: ...7 1 SPECIFICATIONS...
Страница 274: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS EQUIPPED WITH A REAR BLADE MACHINE DIMENSIONS EQUIPPED WITH A REAR BLADE...
Страница 276: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS MACHINES WITH AN OUTRIGGER MACHINE DIMENSIONS MACHINES WITH AN OUTRIGGER...
Страница 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Страница 280: ...7 10 MEMO...
Страница 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Страница 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Страница 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Страница 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Страница 286: ...7 16...
Страница 287: ...8 1 OPTIONS...
Страница 303: ...8 17...