5
22
Connection Check With The Upper Unit
Positioning and securing completed.
Connection of hot water supply, water supply and drain completed.
Opening of the upper unit.
Top panel swing
[Lock position]
Connection pedal
Do not stand on the connection pedal or apply excessive force.
It may damage the product or alter the shape of product.
CAUTION
Assist button
Connection release lever
Top panel swing
①
2
②
①
2
Fit the upper unit to the top panel swing.
Hold the basin and slowly move the upper unit forward.
Fit it so that the top panel swing of the floor unit is inserted
to the opening of the upper unit.
Keep moving it forward slowly until the upper unit is locked.
※
You feel a light click when it is locked.
When the upper unit is transferred, check the surroundings of the upper unit.
Collision to a person or an object may result in injury or damage.
CAUTION
1
Open the top panel swing.
1. Step on the assist button to lift the release lever.
2. While the assist button is held down, use another
foot to raise the release lever to the angle shown in
the image. The top panel swing opens.
●
When the upper unit is transferred, securely hold the basin with
both hands and move it slowly.
Pay attention to any obstacles on the floor.
●
When the upper unit is fit to the top panel swing and it comes near
the lock position, support the basin with your hand and move it
slowly. If you rush to fit it to the top panel swing or lock it, damage
to the devices or injury may be caused.
3
Connect the piping
Depress the connecting pedal with your foot until a click sound is
heard to connect the supply/drainpipes.
※
Insert your foot to the end of the connecting pedal and step on the pedal further.
※
If it is not firmly secured, the connecting pedal will come up. Depress the pedal again.
<
If connection is difficult
>
Repeat depressing two or three times.
If it is still difficult, depress the detaching pedal and then retry the step 2 and 3.
Straight down
Содержание Yume Oasis
Страница 35: ...35 MEMO ...