background image

22

Connection Check With The Upper Unit 

Positioning and securing completed.

Connection of hot water supply, water supply and drain completed.

Opening of the upper unit. 

Top panel swing 

[Lock position] 

Connection pedal 

Do not stand on the connection pedal or apply excessive force. 

It may damage the product or alter the shape of product.

CAUTION 

Assist button

Connection release lever 

Top panel swing 

2

2

Fit the upper unit to the top panel swing. 

Hold the basin and slowly move the upper unit forward. 

Fit it so that the top panel swing of the floor unit is inserted 

to the opening of the upper unit. 

Keep moving it forward slowly until the upper unit is locked. 

 You feel a light click when it is locked. 

When the upper unit is transferred, check the surroundings of the upper unit. 

Collision to a person or an object may result in injury or damage. 

CAUTION 

1

Open the top panel swing. 

1. Step on the assist button to lift the release lever. 

2. While the assist button is held down, use another  

 foot to raise the release lever to the angle shown in   
 the image. The top panel swing opens. 

  When the upper unit is transferred, securely hold the basin with

    both hands and move it slowly. 

    Pay attention to any obstacles on the floor. 

 When the upper unit is fit to the top panel swing and it comes near 

the lock position, support the basin with your hand and move it 

slowly.  If you rush to fit it to the top panel swing or lock it, damage 

to the devices or injury may be caused. 

3

Connect the piping

Depress the connecting pedal with your foot until a click sound is 

heard to connect the supply/drainpipes.

 Insert your foot to the end of the connecting pedal and step on the pedal further.

 If it is not firmly secured, the connecting pedal will come up. Depress the pedal again.

If connection is difficult

Repeat depressing two or three times. 

   If it is still difficult, depress the detaching pedal and then retry the step 2 and 3.

Straight down 

Содержание Yume Oasis

Страница 1: ...he person installing YUME OASIS or those around them due to accidents if YUME OASIS is installed without adhering to the CAUTIONs If YUME OASIS is installed after ignoring this symbol there is the risk of light or moderate injury or physical damage CAUTION March 2017 3rd Edition The actual shape of YUME OASIS and the images and dimensions listed in these instructions may be modified and are subjec...

Страница 2: ...he floor fastening bolt may interfere with the pipe If horizontal plumbing is necessary pay careful attention to the interference with the floor fastening bolt When the floor mount high locks pump SP CH is fastened onto the floor be aware of the following dimensions 1 350 mm or more 2 85 mm or less 3 68 mm or less In the case of horizontal plumbing a floor fastening type pump such as SP FM SP FT a...

Страница 3: ...ory Hot water supply Pipe Copper pipe of 20 CP or more Seat side Drainpipe Number of upper units to be used simultaneously 2 units or less at least VU 50 3 units or more at least UV 75 3 CAUTION Pay careful attention to the interference between the floor fastening bolt and the pipe Water supply Pipe PVC pipe of 20 VP or more or Copper pipe of 20 CP or more Water supply Rc1 2 13 mm ...

Страница 4: ...erproof installation failure Floor Surface Water Leakage Make sure to prevent the water leakage for the worst Installation Of Pipes Plumbing Diameter of pipes and gradient of drain line Drainpipe end treatment Ascending part dimensions The following are important points to adhere to during the installation of pipes Read through the details carefully and ensure that the pipes are installed correctl...

Страница 5: ...cluding burns Ensure that the hot water pipes from water boilers are only run over a short distance so as to minimize resistance Longer pipes can cause fluctuations in temperature and poor hot water delivery Always wrap pipes with lagging material after installation is complete Plumbing particulars for water heater In general the same diameter and same pressure is recommended for main hot water pi...

Страница 6: ... two preparation methods for installation Mortar Bury Method and Composite Panel Platform Method Select either of the methods according to the installation site conditions Refer to the following procedure for Mortar Bury Method and refer to page 9 for Composite Panel Platform Method In the case of the mortar bury method a wooden form and a bury frame our optional item are required Refer to the Cha...

Страница 7: ...me Pipe Form Reinforcement Crosspiece Damp proof Sheet Wall thickness EA OAFWYM optional item Wall thickness t 18 7 Mortar finish thickness If floor panels are not laminated but the floor is finished with mortar it is always required that the top end of the mortar work form is also finished with mortar Do no remove the reinforcement crosspiece until the mortar filling is dried The bury frame may b...

Страница 8: ...ound the openings select a material equal to or thinner than 12 mm Otherwise the floor unit cannot be secured Even in the case of the installation site with wood flooring or tiles used around the openings laminate 3 mm thick hard floor panels made of PVC tiles For the floor panels to laminate the optional YUME OASIS floor panel kit is available in two colors Place another order if necessary Prepar...

Страница 9: ...d posture As for markings rule lines as many as possible so that you can see the layout of the water supply Pipe the hot water supply Pipe and the drainpipe and the floor unit position Arrange the support legs and the floor base panel at this timing Lay pipes to meet the floor unit position marked in Step 2 accord ing to the Plumbing Drawing on page 2 For plumbing check the position of the support...

Страница 10: ...the rafter for fastening at the height The adjustable range of floor unit is up to 150 mm from floor level For raising the floor level over 150 mm provide a base inside of the reinforcement frame with rick block and mortar etc Illustration of rafters Maximum length up to 150 mm 135 Floor unit Rafter Composite panel 591 592 431 432 90 90 Subflooring material t 12 Finishing material t 12 Support Leg...

Страница 11: ...portion for the screw for fastening lid Floor unit lid Be sure to cut off in an exactly same shape as the cut window If not the link mechanism of detaching attaching might not work normally When wood flooring or tiles are used around the openings select a material equal to or thinner than 12 mm Otherwise the floor unit cannot be secured Even in the case of the installation site with wood flooring ...

Страница 12: ... floor unit attaching sash Upper unit of Back Wash Basin YUME Basin Upper unit of Side Wash Basin Neck cushion 1 Head pillow a set of two pillows a set is spare Hair trap 1 Grease 1 Drain cap 1 Tickle stopper rubbers 2 one spare Upper unit main body 1 image is EX OAYMYM Upper unit main body 1 image is EX OAYMYM Neck cushion 1 Neck core 1 Hair trap 1 Grease 1 Surface water travel prevention cloth 1...

Страница 13: ...ing 2 Remove the top panel 1 Use a straight slot screwdriver to completely loosen the screw for fastening lid Hold the sections indicated by the arrows to take out the unit 2 Pull the release lever upward to open the top panel swing 3 4 5 Hold the opening generated by removing the maintenance lid and lift the top panel upward 6 Take out the accompanying items from the inside Remove the maintenance...

Страница 14: ...into the rafter orient the screw obliquely downward to fix Mortar Bury Method Composite Panel Platform Method Decorative floor panel Mortar bury frame resin case of floor unit Decorative floor panel 32 35 subflooring material Rafter for mounting 45 mm square resin case of floor unit Machine screws for use packaged with floor unit ø3 8 x 32 Coarse led SUS Machine screws for use packaged with floor ...

Страница 15: ...ket with the distance across flats of 17 mm Level adjuster nut Resin case of floor unit Resin case of floor unit 3 Fasten the Level Adjuster Nut Level adjuster nut Adjuster Adjuster Long nut 1 2 Central adjuster Corner adjuster Note Cap nut Cap nut 15 CAUTION In the case of replacement with existing RS OASIS use of the mortar work form adjust the central adjuster to reach the mortar floor surface ...

Страница 16: ...n be interrupted or the drain hose can be broken causing water leakage Check that the stopper ring for drain hose is surely fastened If not leakage or slip off of the drain hose may occur Check for double trapping It reduces the flow of drainage In the case of double trapping check the installation position of the basin body and the ascending part dimensions of the pipes and adjust them again Cut ...

Страница 17: ...he stop valve 4 After plumbing check that the packing fit on the wall has not been moved If it is moved hold down the packing again When attaching the water supply Pipe and hot water supply Pipe ensure that they do not come in contact with the basin pipes Doing so will may cause water leaks Always attach the supplied packing Using YUME OASIS without installing the supplied packing may cause water ...

Страница 18: ...t main has casters It can automatically roll down an incline or a slope Make sure to place it on a level floor surface The basin is unstable when it is not fixed to the floor Pay full attention to turnover 18 4 Attachment of lid Attach the lid to the floor unit and then tighten the screw for fastening lid with a straight slot screwdriver The screw for fastening lid can be tightened with a coin etc...

Страница 19: ...nce cover may drop off and the cover may be damaged CAUTION Maintenance cover Maintenance cover 1 cm Front cover Loosen the two left and right screws until the gap between the maintenance cover and the front cover becomes around 1 cm Base cover Base cover Basin tilting function is for avoiding damage of the product It is not for adjusting difference in height This product has a function to sound a...

Страница 20: ...attery with an old one together Battery leakage or rupture may occur Battery 2 Apply your finger to tab of the battery box cover to detach the battery box cover 20 This product uses two AA batteries Battery box cover Battery box Tab CAUTION 5 Write the date of setting in the battery replacement label 6 Attach the maintenance cover Screw Maintenance cover Front cover Insert the maintenance cover in...

Страница 21: ...e the maintenance cover is pushed upward Screw Securely tighten the screws If not the maintenance cover may drop off damaging the floor or the product Do not connect the upper unit to the floor unit with the screws loosened The top panel swing is interfered and the device may be damaged Maintenance cover Screw Screw Maintenance cover Maintenance cover Packing Screw Packing Maintenance cover Forcib...

Страница 22: ...n the top panel swing 1 Step on the assist button to lift the release lever 2 While the assist button is held down use another foot to raise the release lever to the angle shown in the image The top panel swing opens When the upper unit is transferred securely hold the basin with both hands and move it slowly Pay attention to any obstacles on the floor When the upper unit is fit to the top panel s...

Страница 23: ...gned so that the hot water does not exceed 49 C If the supply pressure is the same water is 20 C and hot water is 60 C 1 Check for leakage from the piping connection part and the floor unit piping connection part The connection may get loosen during transportation Closely check the piping connection part inside the upper unit 2 Check the shower outlet flow rate refer to the following standards YUM...

Страница 24: ... valve open Check valve build in strainer Stop valve 3 Pack the cloth beneath the check valve 4 Use a straight slot screwdriver to remove the strainer and then clean the dirt with water and a rag Check valve Strainer Loosen Loosen Straight slot screwdriver CAUTION Hot 5 Drain and clean both the water supply pipe and the hot water supply pipe Drain and clean both the water supply pipe and the hot w...

Страница 25: ... the floor unit in order to prevent accidents in operation 1 There is no cracks or dirt on the basin 2 There is no defects such as scratch in appearance 3 Lift the front of the basin and tilt it to check that the buzzer sounds Only for Back Wash Basin YUME Basin Overflow window Overflow float 1 No leakage in the piping connection part The connection may get loosen during transportation Tighten the...

Страница 26: ... attach the joint 5 Perform the steps after 4 in the order of 3 2 1 Be sure to apply packing on both sides of the joint If not applied leakage may occur When the both pressures of hot water water supplies are 0 18 MPa 1 8 kg f cm2 or less select the floor unit without pressure reducing valve If the hot water or water supply pressure is too low and the outlet flow from the shower head is small 7 6 ...

Страница 27: ...ions to inside CAUTION Hook 3 Adjust the shape of the neck cushion to suit the mounting bracket and attach the basin side hooks of the neck cushion to the neck holding pins Check that both front and back hooks are attached Arrange the shape of the neck cushion along the mounting bracket and attach the right hooks to the neck holding pins of the mounting bracket When the neck cushion is removed det...

Страница 28: ...h Basin The slit on the neck cushion should face the seat side Neck core Fasten the hook at the bottom surface of the neck core Hook Align the height Align the height Neck cushion Neck core The slit on the neck cushion should face the seat side Align the center Neck base Seat side Basin side Surface water travel prevention cloth Hook and loop fastener side Lowest face of the hose 28 Do not force t...

Страница 29: ... water supply pressure 0 1 MPa each Operating temperature 10 to 40 C Upper unit 48 kg Floor unit 16 kg Single faucet handle type 73 135 447 430 490 500 590 607 271 596 931 900 574 490 130 108 208 864 AY OAYMSS Operating temperature 10 to 40 C Upper unit 46 kg Floor unit 16 kg Single faucet handle type Aerator Approximately 8 0 L min Aerator Approximately 9 5 L min 73 135 447 430 490 500 590 607 27...

Страница 30: ...the distance from the center of the chair rotation to the front end of the resin case of the floor unit As above illustration A dimension is not the distance to the sash D dimension The D dimension is given as a reference for non disturbance of the seated person to the operation Set it depending on the site condition and customer s request C Wall Height of basin neck Floor unit Sash Floor unit 9 4...

Страница 31: ... mm 30 1200 mm or longer Men s Chair Lay Flat Wall Height of basin neck Floor unit Sash Floor unit 9 462 108 Distance from center of drain port to front end of floor unit 900 Distance from center of chair to front end of floor unit A Base dimension B Angle of back rest C Distance from center of chair base to wall D A dimension The A dimension is the distance from the center of the chair rotation t...

Страница 32: ...Floor unit 9 462 108 Distance from center of drain port to front end of floor unit 900 Distance from center of chair rotation ram to front end of floor unit A Base dimension B Angle of back rest C Distance from center of chair rotation ram to wall D A dimension The A dimension is the distance from the center of the chair rotation to the front end of the resin case of the floor unit As above illust...

Страница 33: ...or longer Men s Chair Wall Height of basin neck Floor unit Sash Floor unit 9 462 108 Distance from center of drain port to front end of floor unit 800 Distance from center of base to front end of floor unit A Base dimension B Angle of back rest C Distance from center of chair to wall D A dimension The A dimension is the distance from the center of the chair rotation to the front end of the resin c...

Страница 34: ... of floor unit 800 Distance from center of chair rotation ram to front end of floor unit A Base dimension B Angle of back rest C Distance from center of chair rotation ram to wall D A dimension The A dimension is the distance from the center of the chair rotation to the front end of the resin case of the floor unit As above illustration A dimension is not the distance to the sash For the distance ...

Страница 35: ...35 MEMO ...

Страница 36: ...u Osaka Japan Printed in Japan TAKARA BELMONT CORPORATION TEL 06 6213 5945 FAX 06 6212 3680 36 1E05LKA0 Book Number BELMONT HOUSE ONE ST ANDREWS WAY BOW LONDON E3 3PA ENGLAND Takara Belmont UK Ltd TEL 44 0 20 7515 0333 http www takara co uk ...

Отзывы: