1-2
1.4
Precautions for checking and maintenance
(1) Please power off first before performing maintenance or checking job.
(2) Only have authorized electric technician carry out maintenance or checking job when
Power-on is needed in it
(3) Please power off after work.
(4) Adding or replacing hydraulic oil or lubricant, Please use Tailift recommended oil type
or its equivalent. For details, please refer to the chapter 7.
(5) Basically, only one person is needed to serve. If more than one person is called for,
Good communications is required.
(6) Please power off first before getting rid of the iron filings or cleaning the machine.
Содержание TPR1230
Страница 1: ...D E C 0 0 5 0 4 TAILIFT LTD 2006 RADIAL DRILLS TPR1230 TPR1230H TPR1600H TPR2000H Operation Manual...
Страница 11: ...1 6 z Gearbox For TPR 1230 TPR 1230H For TPR 1600H TPR 2000H z Hydraulic oil pump...
Страница 32: ...5 3 5 1 2 For TPR 1600H For TPR 2000H The front view of the machine The rear view of the machine...
Страница 74: ...9 4 9 4 Electrical circuit diagram For TPR 2000H CE Standard...
Страница 83: ...9 13 9 9 Electrical circuit diagram For TPR 1230 Standard...
Страница 84: ...9 14 9 10 Electrical circuit diagram For TPR 1230H Standard...
Страница 85: ...9 15 9 11 Electrical circuit diagram For TPR 1600H TPR 2000H Standard...