FY400 TC_Pt100 Switch Jumper Site Plan
*Note : Please change the input type at the display menu when you finished the jumper switch.
1. Keep controller flat, LED display forwards
2. Pull out controller
,
jumper is below the CPU
3. Turn the Power board up
4. Sensor Input TC. Jumper insert the right site
5.
C
hange Sensor input, pull the Jumper out
6.
Sensor Input Pt100. Jumper insert the left site
TC
CPU
Thermal couple
CPU
Jumper
K. J. R. S. B. E. N. T. W. PL
Ⅱ
. U. L.
Pt100
Pt100
TC
45 A
All manuals and user guides at all-guides.com
all-guides.com
Содержание FA Series
Страница 1: ...0 All manuals and user guides at all guides com a l l g u i d e s c o m...
Страница 7: ...6 2 3 Terminal Wiring Diagram All manuals and user guides at all guides com...
Страница 17: ...16 4 6 FY100 Terminals 175mm x 110mm All manuals and user guides at all guides com...
Страница 18: ...17 4 7 FY101 Terminals 90mm x 90mm All manuals and user guides at all guides com...
Страница 65: ...63 19 Order Information 19 1 FA Series All manuals and user guides at all guides com...
Страница 66: ...64 All manuals and user guides at all guides com a l l g u i d e s c o m...