![TA Instruments ARES-G2 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/ta-instruments/ares-g2/ares-g2_getting-started-manual_3115712051.webp)
ARES-G2 Getting Started Guide
Page 51
LN2 Cooler Connection (optional)
1
Obtain the LN2 flex line from the LN2 accessory kit and connect between the LN2 Cooler and a liquid
nitrogen supply source (bulk tank). Bulk tank needs to be a low pressure (22 psi) source.
2
Obtain the LN2 transfer line.
3
Connect the elbowed end of the transfer line to the LN2 Cooler.
4
Connect the opposite end to the FCO LN2 supply connection.
5
Connect the power cable from the LN
2
cooler to the connector on the right side, above the communications
port.