![T-Drill PLUS 115 SS: Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/t-drill/plus-115-ss/plus-115-ss_instruction-manual_3077711019.webp)
PORTABLE
COLLARING SYSTEM
19
PLUS 115
8. PLUS 115 COLLARING PROCESS
8.1 CLAMPS AND BASE PLATE
1. Choose the ring clamps according to
the run tube diameter and fix the clamps
to the base plate. Attachment takes place
with the clamp locking pins in the base
plate.
For 4” collars, the ring clamps must be
assembled into the outer groove.
The clamps can be assembled to the base plate in two different ways.
2. Clamp the base plate assembly over the collaring area.
1
Place the pointer (1) to the base plate
holes.
3. Center the base plate on the specified place of collar with the pointer and lock it with the
locking levers.
NOTE!
¨
You may also place the PLUS 115 unit sideways to 90° increments, so
you have four different collaring positions available to the same point!
Содержание PLUS 115 SS:
Страница 41: ...PORTABLE COLLARING SYSTEM 41 PLUS 115 15 1 PLUS 115 FOR STEEL EU 5700310 11 8 9 2 3 4 5 6 7 10 1...
Страница 43: ...PORTABLE COLLARING SYSTEM 43 PLUS 115 15 2 PLUS 115 FOR STEEL USA 5700311 11 8 9 2 3 4 5 6 7 10 1...
Страница 47: ...PORTABLE COLLARING SYSTEM 47 PLUS 115 1 2 3 5 8 7 4 6 9 15 4 LEAD SCREW 5700309...
Страница 49: ...PORTABLE COLLARING SYSTEM 49 PLUS 115 15 5 BASE PLATE 5700291 1 4 2 6 7 3 5...
Страница 57: ...PORTABLE COLLARING SYSTEM 57 PLUS 115 15 8 DRILLING UNIT 5700293 A 3 1 7 6 15 16 17 2 19 4 5 13 12 11 10 14 9 8...
Страница 65: ...PORTABLE COLLARING SYSTEM 65 PLUS 115 3 9 13 2 8 2 1 14 4 6 7 10 11 12 5 15 16 COLLARING HEAD 2 2 5700148 C SST...