13
4111-0024 — Apr. 2020
© 2020 Systems, LLC
1. Remove any control panel, bumpers or palletizing
that may be banded to the dock leveler. Do not
remove banding on hoist cylinder.
2. Make sure the mounting hardware of lifting
brackets (
A
) is snug. The brackets should pivot
without binding on the mounting cap screw.
3. Attach lifting chains to lifting brackets (
A
) and to
a lifting device (i.e., hoist or fork truck) having the
appropriate lifting capacity and reach (see Figure 8).
4. Ensure maintenance props (
B
) are in the lowered
position and tightly secured (see Figures 6 and 7).
Note:
Maintenance props must be in the lowered
position and tightly secured during installation and
service.
Prepare Dock Leveler (continued)
Overall length of lifting chain and bracket must be
kept to a minimum to prevent interference between
the lifting equipment and the building ceiling or
door as the dock leveler is lowered into the pit.
INSTALLATION
Installation of vertical dock levelers from inside
is recommended, as combined height of leveler
and proper lifting equipment may be greater than
outside door height.
A
Figure 8
Содержание McGuire VSH Series
Страница 27: ...25 4111 0024 Apr 2020 2020 Systems LLC MAINTENANCE This page intentionally left blank...
Страница 47: ...45 4111 0024 Apr 2020 2020 Systems LLC PARTS This page intentionally left blank...
Страница 49: ...47 4111 0024 Apr 2020 2020 Systems LLC PARTS This page intentionally left blank...