20
4111-0024 — Apr. 2020
© 2020 Systems, LLC
Put New Dock Leveler Into Service
INSTALLATION
A hard hat or other applicable head protection
should always be worn when working under or
around a dock leveler.
Always stand clear of platform lip when working in
front of the dock leveler.
1. Purge air from hydraulic system, adjust rod eye
and install cylinder pin as instructed on page 18.
2. Check and top off hydraulic fluid as required. See
pages 26-27 for acceptable fluid specifications and
correct fluid level.
3. Test leveler for operation:
a. Lower dock leveler and check to make sure
the leveler goes into float mode approximately
15” above the dock floor. Allow the leveler to
float to full below dock position. Make sure the
dock makes contact with pit floor. Then, press
and hold the RAISE button until the leveler is
fully stored and the BLUE “Leveler Stored” light
comes on.
b. Lower dock leveler to approximately 45
degrees, then press the LOWER and LIP buttons
simultaneously; the lip will fold. Press and hold
the RAISE and the LIP buttons and the lip will
extend. Then, press and hold the RAISE button
until the leveler is fully stored and the BLUE
“Leveler Stored” light comes on.
Note:
If the dock leveler encounters issues during
testing and must be raised with an external lifting
device, the hydraulic system must be purged again.
Содержание McGuire VSH Series
Страница 27: ...25 4111 0024 Apr 2020 2020 Systems LLC MAINTENANCE This page intentionally left blank...
Страница 47: ...45 4111 0024 Apr 2020 2020 Systems LLC PARTS This page intentionally left blank...
Страница 49: ...47 4111 0024 Apr 2020 2020 Systems LLC PARTS This page intentionally left blank...