English
The user is responsible for ensuring that the unit is in perfect working order and that the technical
installation and
minimum annual maintenance
operations have been performed by a qualified
technician in accordance with the procedures described in the present manual.
Caution
18 SysCoil Comfort
Material must not be returned without permission of our After Sales Department.
To return the material, contact your nearest sales office and ask for a "return form". The return form shall
be sent with the returned material and shall contain all necessary information concerning the problem
encountered.
The return of the part is not an order for replacement. Therefore, a purchase order must be entered through
your nearest distributor or regional sales office. The order should include part name, part number, model
number and serial number of the unit involved.
Following our personal inspection of the returned part, and if it is determined that the failure is due to faulty
material or workmanship, and in warranty, credit will be issued on customer's purchase order. All parts shall
be returned to our factory,
transportation charges prepaid
.
The part number, the order confirmation and the unit serial number indicated on the name plate must be
provided whenever service works or spare parts are ordered.
For any spare part order, indicate the date of unit installation and date of failure. Use the part number
provided by our service spare parts, if it not available, provide full description of the part required.
12. IN CASE OF WARRANTY - MATERIAL RETURN PROCEDURE
13. ORDERING SERVICE AND SPARE PARTS ORDER
WARNING
:
Isolate unit from power supply before working on unit.
Depending on actual operational constraints and regulatory changes, the installer might recommend
increased maintenance operations and more frequent inspections.
14. MAINTENANCE
These units have been designed for minimum maintenance through the use of permanently lubricated
components. However, there are operational maintenance requirements that require regular attention to
ensure optimum performance.
14.1. SERVICING CHECKLIST
Carry out a visual inspection of the complete installation in service.
Check the general cleanness of the installation, and check if the condensate evacuations is not blocked,
specialy on the indoor coil, before the cooling season.
14.1.1. CASING
1.
Clean the outer panels.
2.
Remove the panels.
14.1.1.1. FOOT COVER REMOVAL
To remove the foot cover, press
and
, and push
as shown on photos.
To re-install it, do as above in the reverse way.
Содержание SysCoil Comfort SCC10
Страница 2: ......
Страница 23: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO...
Страница 41: ......