PROTOUCH-WIDE MONITOR: user documentation - PRELIMINARY
DOC/PROTOUCH-WIDE_MONITOR; V0.2
DOC_PROTOUCH-WIDE_MONITOR_V0.3.docx
Seite 23 von 35
© 2019 Syslogic Datentechnik AG | All rights reserved
2.
Remove the screws highlighted in red and then remove the mounting frame.
Fig. 5
Screws to hold the mounting Frame
3.
Insert the projected capacitive touch panel from the front into the cut out and make sure that the sealing fits properly.
4.
Reattach the mounting frame and fix it into place by reattaching the screws highlighted in red. Required torque: 1.3Nm
5.
The product is now installed properly.
Fig. 6
Fully installed PROTOUCH-WIDE MONITOR
Wall
Projected capacitive touch panel