HYDROBOX
™
Operations and Maintenance Manual
Mounting the Sensor Unit
This section outlines the steps for mounting the Sensor Unit. Refer to Figure 2-2 while installing. The
unit may be mounted either horizontally or vertically. The keyhole slots make installation in hard to
reach areas easier, but be sure to tighten all mounting hardware securely. Insure that adequate room is left
for installing and removing the cable connections. Also, verify that the status indicator (labeled STAT) is
visible.
Step 1) Confirm that the area behind the intended-mounting surface on the bulkhead is clear of
equipment, panels, electrical cables, conduits, hydraulic, air, water lines or pipes.
Step 2) Using the Sensor Unit as a template mark a drill point for each of the mounting holes. Insure that
the marks for the keyholes are placed in the smaller, slotted areas.
Step 3) Drill three (3) holes that will work with the mounting hardware that has been selected (not
supplied). The 3 holes on the Electronic unit are 0.195 inches in size (#8 size Screw
recommended for installation).
Figure 2-2 Bulkhead Mounting the Sensor Unit
INSTALLATION 2-7
©
2006 SyQwest Incorporated
Содержание HydroBox
Страница 2: ......