Synopsys, Inc.
51
5.60a
March 2020
PCIe IP Prototyping Kit Installation Guide
Status LEDs
Supervisor Design – Loaded
OK
ERROR
Stop
Supervisor Firmware – Check and Load OK
Error
Stop
Power Modules – Check
OK
Error
Stop
Slave Systems Version – Check
OK
Error
Stop
Startup Project – Load
Yes
No
Continue
Startup Project – Loaded Successfully
Yes
Error
Continue
Table A-2
HAPS-80 Power-up Supervision LEDs (Continued)
LED
Power-up Procedure
Action
RESET
READY
ALERT
PWR