Symeo LPR
®
-System
LPR
®
-2DB
Product Documentation
Installation
Copyright © Symeo 2012
Page 37 of 132
5 Installation
5.1 Installation of the LPR-2DB Station (mobile unit)
BSB000313 (single receiver, TCP/IP interface, 2 antenna ports)
BSB000319 (single receiver, RS232 interface, 2 antenna ports)
BSB000603 (double receiver, TCP/IP interface, 4 antenna ports)
BSB000604 (double receiver, RS232 interface, 4 antenna ports)
BSB000605 (double receiver, TCP/IP interface, 2 antenna ports)
BSB000606 (double receiver, RS232 interface, 2 antenna ports)
During Installation, the LPR-2DB Station has to be opened. Therefore it
is important to avoid ingress of moisture, dust or any particles into the
housing during the installation process. Make sure that there is enough
room for the connectors, and particularly that the antenna cable is
accessible; pay attention to the permitted bending radius (center of
radius to cable core) for standard cables of 10,5cm (for multiple bending
under mechanical load) and 4cm (unloaded and static bending).
The LPR-2DB Station should preferably be installed so that the
connecting sockets point downwards. In this way, the connections are
protected from rain and dust.
To install the LPR-2DB Station, you require 4 round head M6 x 30
screws (at least).
Check the position of the station on the device on which the LPR-2DB Station is to be
installed (e.g. a crane bridge). Bear in mind the installation instructions listed above.
Drill holes in the device on which the LPR-2DB Station/ Rubber pads are to be installed.
Drill-hole distances: 11 cm wide, 24 cm high.
Rubber pads are provided by Symeo (see Figure 18). The rubber pads reduce vibration
to the LPR station. Place 4 rubber pad into the drill holes ad fasten the screws.
Open the LPR-2DB Station: With a Phillips screwdriver (Size 0), loosen the top four
screws of the LPR-2DB Station lid.
Screw the LPR-2DB Station tightly to the device. The installation holes of the rubber pads
are provided for this purpose. Check that the station is mounted securely.
Close the station: Place the cover of the LPR-2DB Station on top and fasten the cover
with the four screws. Make sure that the cover is securely attached to the housing.