![Sym Citycom.300i Скачать руководство пользователя страница 117](http://html1.mh-extra.com/html/sym/citycom-300i/citycom-300i_service-manual_1418667117.webp)
5
. Removal & Installation of Engine
5-11
Installation of Engine
Install the engine according to the reversing order
of removal.
Caution
Note both feet and hands safety for
squeezing as engine installation.
Do not bent or squeeze each wires or hose.
Route all cables and wires in accordance with
the routine layout.
Engine hanger nut:
Torque Value: 7.5~9.5kgf-m
Rear cushion bolt:
Torque Value: upper: 3.5~4.5kgf-m
under: 2.4~3.0kgf-m
Rear wheel axle nut:
Torque Value: 11.0~13.0kgf-m
To this chapter contents
Содержание Citycom.300i
Страница 1: ...DK Version 1 0 2009 Citycom 300i SERVICE MANUAL FOREWORD HOW TO USE THIS MANUAL CONTENTS SERIAL NUMBER...
Страница 5: ...Serial Number Home page Contents...
Страница 38: ...2 Maintenance Information 2 17 Note To this chapter contents...
Страница 46: ...3 LUBRICATION SYSTEM 3 8 Notes To this chapter contents...
Страница 106: ...4 Fuel Injection System 4 60 Note To this chapter contents...
Страница 173: ...10 AC Generator Starting Clutch 10 10 Notes To this chapter contents...
Страница 195: ...12 Cooling System 12 14 Notes To this chapter contents...
Страница 223: ...14 Brake System 14 12 Note To this chapter contents...
Страница 244: ...17 Electrical System 17 5 FUSE Fuse circuit diagram To this chapter contents...
Страница 262: ...17 Electrical System 17 23 Note To this chapter contents...
Страница 270: ...19 Electrical Diagram 19 1 Home page Contents LH30W EFi Electrical Diagram 19...