background image

 

12 

Chapter 

03

 

Technical desc

 

Flight behavior 

RAST shows its full strength in 
turbulent air: RAST effectively stabilises 

the canopy and smoothly balances 
turbulent air. 
Through more direct and precise 

handling, it offers more control in 
turbulent conditions. 
This makes the MIRAGE 2 RS extremely 

stable and forgiving, which means 
significantly more precision and 
effective performance for the pilot. 

L

 

TIP 

Do not be tempted by the increased 
safety offered by RAST into taking 

greater risks. Instead, you should use 

RAST as your personal crumple zone 
if there is ever a situation where you 
have misjudged conditions. 

Type testing 

The Mirage 2 RS has been extensively 
and successfully tested by SWING for 
its suitability for the intended use. 
In addition, the strength according to 

DIN EN 926-1:2016 was verified by an 
accredited licensing body. 
Please refer to the technical data for 

the total masses permissible for 
operation. 
The MIRAGE 2 RS does not comply with 
the German LTF NFL HG GS 2-565-20 
for hang gliders and paragliders. 
 
 
 
 

 

Technical data 

MIRAGE 2 RS  

8,5 

9,5 

11 

13 

15 

Number of cells 

27 

27 

27 

27 

27 

Glider weight [kg] 

1,7

 

1,8

 

2,0

 

2,2

 

2,4

 

Wing area [m²]

 

7,8

 

8,8

 

10,5

 

12,5

 

15

 

Wing area 
projected [m²]

 

6,8

 

7,6

 

9,0

 

11,0

 

13,0

 

Wing span [m]

 

5,4

 

5,8

 

6,3

 

6,9

 

7,6

 

Wing span 
projected [m]

 

4,5

 

4,8

 

5,2

 

5,7

 

6,3

 

Aspect ratio

 

3,8

 

3,8

 

3,8

 

3,8

 

3,8

 

Aspect ratio 
projected

 

2,8

 

2,8

 

2,8

 

2,8

 

2,8

 

Maximum allowed 
take off weight [kg]

 

50-119

 

50-119

 

50-119

 

60-119

 

60-119

 

Further technical data and material information can be found in the service and 
inspection booklet.

Содержание MIRAGE2 RS

Страница 1: ......

Страница 2: ......

Страница 3: ...g pleasure with your MIRAGE 2 RS Your Speedwing is characterised by innovative design first class materials and high quality manufacturing The life of your Speedwing depends largely on how you handle...

Страница 4: ...s to the Manual There is further information about the SWING website in the section SWING on the World Wide Web Express written consent from SWING Flugsportger te GmbH is required for any duplication...

Страница 5: ...URE OF THE MIRAGE 2 RS 11 RAST 11 TECHNICAL DATA 12 04 SETTING UP THE MIRAGE 2 RS AND FIRST FLYING 13 BEFORE THE FIRST FLIGHT 13 Adjusting the main brake lines 13 RESCUE PARACHUTE 14 SUITABLE HARNESSE...

Страница 6: ...TS 24 REPAIRS 24 Small repairs to the glider 24 SWING workshops 24 REGULAR INSPECTIONS 24 Lines 24 INSPECTION 25 General 25 Inspection periods 25 Validity of inspection 25 Checking by yourself 26 08 S...

Страница 7: ...f the Speedwing 2 service and inspection booklet PDF download Technical data as well as unit specific information for inspection Special text DANGER Sections of text headed Danger indicate a situation...

Страница 8: ...core values of SWING Flugsportger te GmbH and they have implications for everything we do We also believe that our customers share our environmental awareness Respect for nature and the environment Yo...

Страница 9: ...circumstances as this will invalidate any warranty claim and any operating permit First familiarise yourself with your MIRAGE 2 RS on the practice slope The legislation in force in the respective coun...

Страница 10: ...ngers of extreme turbulence cannot be calculated Avalanches Only move in unsecured terrain with the necessary training and equipment avalanche transceiver shovel etc 2 Check your equipment Take a clos...

Страница 11: ...ked for airworthiness before each launch A launch may only take place if the Speedwing is airworthy Furthermore the pilot must comply with the respective national regulations outside Germany Intended...

Страница 12: ...her contractual partners from any claims for liability loss damage injury or expenses which may affect you your next of kin and relatives or other users of your MIRAGE 2 RS insofar as these result fro...

Страница 13: ...dge 12 mm webbing width optimized trimmers dirt outlets at the trailing edge completely new color design RAST The MIRAGE 2 RS features Swing s unique Ram Air Section Technology known as RAST for short...

Страница 14: ...ccessfully tested by SWING for its suitability for the intended use In addition the strength according to DIN EN 926 1 2016 was verified by an accredited licensing body Please refer to the technical d...

Страница 15: ...under any circumstances WARNING Any changes or improper repairs to this Speedwing render invalid the certification and warranty Adjusting the main brake lines The MIRAGE 2 RS is delivered ex factory w...

Страница 16: ...issues may arise and performance and launch behaviour may deteriorate if the brake lines are shortened too much Brake knots The overhand knot shown below is the most suitable for connecting the brake...

Страница 17: ...opy The SWING Speedflying Team advises every pilot who wishes to fly his MIRAGE 2 RS over the backrisers to do so between the B and C risers on the marked C bridge The trimmer travel itself has a stro...

Страница 18: ...best to weight shift with the trimmers closed It reacts least with the trimmers fully open The more you open the trimmers the longer the braking distances will be The position of the brake handles in...

Страница 19: ...s MANDATORY in most speedriding sites For take off take the glider out of the speedbag roll up the speedbag and pack it into the side pocket of your harness After riding Gather the MIRAGE 2 RS take ou...

Страница 20: ...RS by doing wind up exercises and practicing a few runs take off flight behavior and landing on a practice slope Your first runs should take place in a terrain you know well and are comfortable with a...

Страница 21: ...at take off the MIRAGE 2 RS may surge forward Fig 10 Braking during start It is best to take off with the brakes in your hands only about 30 applied As soon as the MIRAGE 2 RS is above you apply the...

Страница 22: ...C planes allows the Mirage 2 RS to be controlled precisely with the trimmers closed and open With the trimmers open the C bridge allows the pilot to control the angle of attack to adapt the glide to t...

Страница 23: ...ong time please follow the care instructions and handle your MIRAGE 2 RS with care L PLEASE NOTE Never drag the umbrella across the ground Pointed and sharp objects such as stones or branches can dama...

Страница 24: ...mmer The MIRAGE 2 RS is equipped with different high quality and precisely manufactured lines which have been selected according to the load and application areas Similar to the cloth material lines a...

Страница 25: ...carefully and thoroughly Leave the glider to dry in a place which is well ventilated and in the shade L PLEASE NOTE Do not use chemicals brushes rough cloths high pressure cleaners or steamers to clea...

Страница 26: ...MIRAGE 2 RS can be ordered direct from us at info swing de The replacement of complete groups of lines must be carried out by a SWING authorised workshop SWING workshops All repairs and servicing sho...

Страница 27: ...sult in loss of control of the glider Always replace lines which are damaged If you need to replace damaged or worn out parts use only original parts or approved parts from the manufacturer Use only i...

Страница 28: ...on 08 SWING on the World Wide Web SWING Website SWING offers a comprehensive programme on the World Wide Web to provide you with additional information about your MIRAGE 2 RS and many other speedwing...

Страница 29: ...photos that you upload to your social media profiles with SWINGParagliders SWINGSpeedflyingTeam MIRAGE2RS More page http twitter com SSTspitfire Now we wish you a lot of fun with your MIRAGE 2 RS Your...

Страница 30: ..._ __ Check flight date __ __ __ __ 202__ Mark and signature ________________________________________ Pilot details Proof of ownership Name Address Telephone Email Inspection and repairs carried out Da...

Страница 31: ...Notes...

Страница 32: ......

Отзывы: