5
Operation and maintenance instructions
Disclaimer
Danger/Warning/Caution
•
All staff concerned shall acquaint themselves with
these instructions before beginning any work on the
unit. Any damages to the unit or its components
caused by improper handling or misuse by the
purchaser or the installer cannot be considered
subject to guarantee if these instructions have not
been followed correctly.
•
Make sure that the power supply to the unit is
disconnected before performing any maintenance or
electrical work!
•
All electrical connections must be carried out by an
authorized installer and in accordance with local
rules and controls.
•
Although the mains supply to the unit has been
disconnected there is still risk for injury due to
rotating parts that have not come to a complete
standstill.
•
Beware of sharp edges during mounting and
maintenance. Make sure that a proper lifting device
is used. Use protective clothing.
•
Unit should always be operated with closed doors
and panels.
•
If the unit is installed in a cold place make sure that
all joints are covered with insulation and are well
taped.
•
Duct connections/duct ends should be covered
during storage and installation, in order to avoid
condensation inside of the unit.
•
Check that there are no foreign objects in unit,
ducting system or functional sections.
•
The unit is packed to prevent damage of the
external and internal parts of the unit, dust and
moisture penetration. If the unit is not to be installed
immediately, it should be stored in a clean, dry
area. If stored externally, it should be adequately
protected from the weather influence.
RANGE OF APPLICATION
The GLOBAL units are designed for use in comfort
ventilation applications.
Depending on the variant selected, GLOBAL units can be
utilised in buildings such as office buildings, schools, day
nurseries, public buildings, shops, residential buildings,
etc.
GLOBAL units equipped with plate heat exchangers can
also be used for the ventilation of moderately humid
buildings; however not where the humidity is continuously
high, such as in indoor swimming baths, saunas, spas or
wellness centres.
Please do contact us if you have a need for a unit that is
suited for such an application.
HOW TO READ THIS DOCUMENT
Please make sure that you have read and understood the
safety precautions below.
Please read chapter 2 where the Symbols and
Abbreviations used for GLOBAL are listed and Chapter 5
where the operating principles of a GLOBAL air handling
unit are described. The commissioning of the unit is
described in chapter 6.
Содержание GLOBAL LP
Страница 2: ...2 Operation and maintenance instructions...
Страница 66: ...Version 20210503 We reserve the right for changes...