13
Operation and maintenance instructions
1.
Main power switch
2.
Main power switch for electrical coils
(both internal pre-hating and post-heating)
3.
Wiring box TAC controller
4.
Supply fan
5.
Extract fan
6.
Kit CA -airflow measurement (option)
7.
Outdoor air filter (bag or pleated)
8.
Extract air filter (bag or pleated)
9.
Heat exchanger (Plate)
10.
Modulating 100% by-pass
11.
Drain pan and drain pipe
12.
Pre-heating electrical antifrost coil
13.
Internal post-heating water or electrical coil (accessory)
14.
Motorized damper (at outdoor air side - accessory)
15.
Motorized damper (at exhaust air side - accessory)
16.
Access panel
17.
Flexible connection(accessory)
18.
Slip Clamps (accessory)
19.
Water connection for postheating (accessory)
1, 2 and 3 must be installed by an accredited electrician
Note: internal electrical coils, motorized dampers, internal fan-pressure sensors, flexible connections and
slip-clamps have to be ordered initially and are all pre-mounted and factory wired. Internal heating water-
coil accessory is pre-mounted but has to be hydraulically and electrically connected by the installer.
COMPONENTS GLOBAL LP
5
4
3
2
6
7
8
9
9
10
11
19
13
20
20
18
18
GLOBAL LP
Содержание GLOBAL LP
Страница 2: ...2 Operation and maintenance instructions...
Страница 66: ...Version 20210503 We reserve the right for changes...