Section III: Operation
3.0.OPE.SL-75
OPERATING INSTRUCTIONS
LOADING A CONTAINER
STEP 1.
ENGAGE THE P.T.O. (REFER TO P.T.O. MANUAL FOR OPERATION).
NOTE:
SKIP TO
STEP 2.
IF POWERPACK INSTALLED.
STEP 2.
TURN POWER SWITCH ON. RETRACT THE JIB (LEFT CONTROL LEVER LEFT). THEN, TILT THE ARM
BACKWARD (LEFT CONTROL LEVER LEFT).
STEP 3.
MAKE SURE THE WORK AREA IN FRONT OF THE CONTAINER IS CLEAR OF PEOPLE AND OBSTACLES.
MOVE THE TRUCK BACKWARDS UNTIL THE HOOK ENGAGES THE CURVED LIFTING BAR OF THE
CONTAINER. NEVER EXTEND THE JIB TO REACH THE PROPER CATCHING HEIGHT, RATHER TILT THE
ARM.
WARNING:
MAKE SURE WORK AREA IS CLEAR OF PEOPLE AND OBSTACLES PRIOR TO
DUMPING OR UNLOADING CONTAINERS. SWAPLOADER STRONGLY
RECOMMENDS THAT A BACKUP ALARM BE INSTALLED ON THE TRUCK
CHASSIS. THE OPERATION OF THE HOOK HOIST IS THAT THE TRUCK IS
BACKED UP TO THE BODY TO PICK IT UP AND SO THERE IS A POTENTIAL
PINCH POINT BETWEEN THE BODY AND THE HOOK.
3-1
Содержание SL-75
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 75 ...
Страница 2: ......
Страница 4: ...0 0 TOC SL 75 V OPTIONS Spacer Kit 6 1 Tank Circuit EHV 6 2 Hose Circuit EHV 6 3 ...
Страница 28: ......
Страница 32: ......
Страница 36: ......
Страница 38: ...Section IV Maintenance 4 0 MAI SL 75 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 56: ......
Страница 57: ......
Страница 58: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...