Section II: Installation - Accessories
2.8.INS.ACC.10H90
4. Once the mount brackets are
located on the container, weld
the roller mount brackets in
place
(see Fig. A).
5. Install the roller
[Pt. No. 10H12]
between the brackets with the
roller axle
[Pt. No. 10H31]
and
the fasteners provided
(see Fig.
C)
. Grease the rollers before
use.
10H91
10H90
Figure B
Figure C
MATERIAL LIST FOR 10H90 AND 10H91
ITEM
PART #
QTY
DESCRIPTION
WT-lb/ea.
1
32H03
4
Roller Ear
11.95
2
10H12
2
Roller Wdmt.
39.76
3
10H31
2
Roller Axle Wdmt.
7.28
4
00P62
2
3/8-16 UNC x 1 Bolt
.05
5
90P03
2
1/8 NPT Grease Zerk
.01
6
00755
2
3/8 Dia. Lock Washer
.01
7
00P36
2
3/8 Dia. Washer H.T.
.10
2-18
Содержание SL-75
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 75 ...
Страница 2: ......
Страница 4: ...0 0 TOC SL 75 V OPTIONS Spacer Kit 6 1 Tank Circuit EHV 6 2 Hose Circuit EHV 6 3 ...
Страница 28: ......
Страница 32: ......
Страница 36: ......
Страница 38: ...Section IV Maintenance 4 0 MAI SL 75 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 56: ......
Страница 57: ......
Страница 58: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...