Section II: Installation
2.0.INS.SL-75
EHV INSTALLATION
1.
Review all directions and diagrams provided before starting the
E
lectric over
H
ydraulic
V
alve Installation.
2.
Mount the 22P58 EHV to the hoist’s
Main Frame and attach all hoses,
hose clamp assemblies and fittings
as shown on Pgs. 6-5 through 6-7
(also see Illustrations).
Electric Over Hyd. Valve - SERVICE PARTS SL-75
ITEM
PART
#
QTY
DESCRIPTION
1
13P36
1
Hose Assy 83.5 08-08FJ/08FJ45
2
13P37
1
Hose Assy 86 08-08FJ/08FJ5
3
13P62
2
Hose Assy 45 08-08FJ/08FJ
4
22P82
1
Solenoid Operated Valve, Coil
5
22P83
1
Solenoid Operated Valve, Spool
6
22P84
1
Relief Valve Cartridge (3250)
7
22P85
1
Dump Valve
NOTE:
THE FIGURES BELOW DO NOT NECESSARILY
DEPICT YOUR HOIST AND ARE ONLY MEANT
TO ILLUSTRATE ROUTING OF THE HYDRAULIC
LINES FROM THE VALVE TO THE CYLINDERS
2-10
Содержание SL-75
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 75 ...
Страница 2: ......
Страница 4: ...0 0 TOC SL 75 V OPTIONS Spacer Kit 6 1 Tank Circuit EHV 6 2 Hose Circuit EHV 6 3 ...
Страница 28: ......
Страница 32: ......
Страница 36: ......
Страница 38: ...Section IV Maintenance 4 0 MAI SL 75 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 56: ......
Страница 57: ......
Страница 58: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...