Section III: Operation
3.0.OPE.SL-75
LOADING A CONTAINER
(cont’d)
STEP 4.
CYCLE THE ARM FORWARD (RIGHT CONTROL LEVER RIGHT), MAKING SURE THE CURVED LIFTING
BAR IS SECURELY ATTACHED TO THE HOOK. RELEASE THE BRAKES OF THE TRUCK AND STEER TO
CORRECTLY ALIGN THE TRUCK WITH THE CONTAINER. WATCH THE CONTAINER RAILS TO SEE THAT
THEY COME TO REST CENTERED ON THE REAR ROLLERS. DO NOT EXTEND THE JIB DURING LIFTING.
STEP 5.
WHEN THE CONTAINER IS RESTING ON THE FRAME, MOVE THE JIB FORWARD ALL THE WAY TO
ENSURE THE CONTAINER IS HELD IN THE BODY LOCKS (LEFT CONTROL LEVER RIGHT).
DUMPING:
STEP 1.
MOVE THE JIB FORWARD (LEFT CONTROL RIGHT) TO ENSURE THAT THE CONTAINER IS LOCKED.
STEP 2.
EXTEND THE MAIN LIFT CYLINDERS (RIGHT CONTROL LEFT).
CAUTION:
DO NOT RETRACT THE JIB WHILE DUMPING.
RETRACTING THE JIB DURING DUMPING MAY
UNLOCK THE MECHANICAL JIB LATCHES WHICH COULD ALLOW THE CONTAINER TO CRASH DOWN
ONTO THE HOIST AND/OR ABRUPTLY UNLOAD.
3-2
Содержание SL-75
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 75 ...
Страница 2: ......
Страница 4: ...0 0 TOC SL 75 V OPTIONS Spacer Kit 6 1 Tank Circuit EHV 6 2 Hose Circuit EHV 6 3 ...
Страница 28: ......
Страница 32: ......
Страница 36: ......
Страница 38: ...Section IV Maintenance 4 0 MAI SL 75 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 56: ......
Страница 57: ......
Страница 58: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 ...