3-48 ENGINE
• Remove the kick starter driven gear
5
, spring
6
and kick
starter shaft
7
.
BEARING INSPECTION
Wash the bearing with a cleaning solvent and lubricate it with
motor oil before inspection. Rotate the inner race and check to
see that it turns smoothly. If it does not turn quietly and
smoothly, or if there are signs of any abnormalities, the bearing
is defective and must be replaced with a new one.
• Remove the kick starter shaft bearing with the special tool.
$
09921-20240: Bearing remover set (10 mm)
REASSEMBLY
• Reassemble the kick starter in the reverse order of disassem-
bly. Pay attention to the following points:
• Apply SUZUKI SUPER GREASE “A” onto the inside of the
kick starter shaft spacer.
*
99000-25010: SUZUKI SUPER GREASE “A”
• Apply a light coat of SUZUKI SUPER GREASE “A” onto the
end of the kick starter shaft.
*
99000-25010: SUZUKI SUPER GREASE “A”
• Install the kick starter return spring
1
, kick starter shaft
3
,
and kick starter spring hook its end
1
onto the clutch cover
boss
2
.
Play
Play
http://mototh.com
Содержание UY125
Страница 4: ...White Page http mototh com ...
Страница 12: ...White Page http mototh com ...
Страница 31: ...PERIODIC MAINTENANCE 2 19 http mototh com ...
Страница 108: ...White Page http mototh com ...
Страница 183: ...ELECTRICAL SYSTEM 6 7 8 Ignition coil 9 Starter relay 0 Starter motor http mototh com ...
Страница 214: ...White Page http mototh com ...
Страница 234: ...7 20 SERVICING INFORMATION CLUTCH TRANSMISSION DRIVE BELT INSTALLATION 1 1 1 1 1 Remove excess grease http mototh com ...
Страница 235: ...SERVICING INFORMATION 7 21 COOLING FAN INSTALLATION 33 N m 3 3 kgf m 10 N m 1 0 kgf m http mototh com ...
Страница 236: ...7 22 SERVICING INFORMATION FUEL TANK INSTALLATION Fuel tap Vacuum hose Fuel hose Clip http mototh com ...
Страница 241: ...SERVICING INFORMATION 7 27 REAR BRAKE CAM LEVER INSTALLATION 33 40 35 Match Match Match Set position http mototh com ...
Страница 243: ...SERVICING INFORMATION 7 29 SEAT HINGE INSTALLATION 96 Seat Assy E ring RH LH FWD http mototh com ...
Страница 244: ...7 30 SERVICING INFORMATION FRONT WHEEL UY125 5 J _ http mototh com ...
Страница 245: ...SERVICING INFORMATION 7 31 FRONT WHEEL UY125S Clearance 1 mm http mototh com ...
Страница 246: ...7 32 SERVICING INFORMATION REAR WHEEL http mototh com ...
Страница 258: ...Prepared by August 2005 Part No 99500 31310 01E Printed in Thailand 260 THAI SUZUKI MOTOR CO LTD http mototh com ...