TRANSMISSION AND CRANKSHAFT 10-11
PRIMARY DRIVEN GEAR REASSEMBLY
• Install the primary driven gear and washer onto the crank-
shaft.
• Apply THREAD LOCK SUPER “1322” to the primary driven
gear nut and tighten it to the specified torque with the special
tool.
99000-32110: THREAD LOCK SUPER “1322”
09910-20116: Conrod holder
Primary driven gear nut: 70 N·m (7.0 kgf-m, 50.5 lb-ft)
NOTE:
The primary driven gear nut has left-hand thread.
• Reassemble the gearshift linkage. (
9-4)
• Reassemble the kick idle gear and kick starter shaft. (
8-4)
• Reassemble the exhaust valve governor. (
6-13)
• Reassemble the stator and magnet rotor. (
13-6)
• Reassemble the clutch and clutch cover. (
7-6)
• Reassemble the kick starter lever.
• Reassemble the piston and cylinder. (
6-9 and -10)
• Remount the engine. (
5-5)
• Pour transmission oil and coolant. (
2-7 and -8)
Thrust
washer
Содержание RM85
Страница 1: ...Part No 99011 02B82 01A April 2006 EN TK RM85 L OWNER S SERVICE MANUAL ...
Страница 10: ... MEMO ...
Страница 42: ...3 TROUBLESHOOTING 3 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 3 2 ENGINE 3 2 CHASSIS 3 5 ...
Страница 47: ... MEMO ...
Страница 85: ...7 2 CLUTCH CONSTRUCTION CLUTCH 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 93: ...8 2 KICK STARTER CONSTRUCTION KICK STARTER ...
Страница 97: ... MEMO ...
Страница 99: ...9 2 GEARSHIFTING CONSTRUCTION GEARSHIFT LINKAGE 19 N m 1 9 kgf m 13 5 lb ft 23 N m 2 3 kgf m 16 5 lb ft ...
Страница 105: ...10 2 TRANSMISSION AND CRANKSHAFT CONSTRUCTION TRANSMISSION AND CRANKSHAFT 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 115: ... MEMO ...
Страница 117: ...11 2 FUEL SYSTEM CONSTRUCTION FUEL SYSTEM ...
Страница 121: ...11 6 FUEL SYSTEM REASSEMBLY Reverse the sequence of removal ...
Страница 123: ...12 2 COOLING SYSTEM CONSTRUCTION COOLING SYSTEM 2 5 N m 0 25 kgf m 1 8 lb ft 2 5 N m 0 25 kgf m 1 8 lb ft ...
Страница 141: ... MEMO ...
Страница 200: ...SERVICING INFORMATION 18 15 Radiator hose Throttle cable Clamp Clutch cable ...
Страница 205: ... MEMO ...