2-14 PERIODIC MAINTENANCE
DRIVE CHAIN ADJUSTMENT
• Loosen the axle nut
1
.
• Loosen the lock-nut
2
.
• Adjust the drive chain slack to the specification by turning the
adjusters
3
.
• Check that both right and left alignment marks
4
are at the
same position.
• Tighten the axle nut
1
and lock-nut
2
.
Axle nut: 72 N·m (7.2 kgf-m, 52.0 lb-ft)
NOTE:
Pull the upper drive chain tight and lock it by placing a bar
between the drive chain and rear sprocket while tightening the
axle nut. This will help prevent the chain adjusters from coming
to have play.
20TH PITCH LENGTH
• Pull the drive chain tight and measure the 20th pitch length.
Service Limit: 259 mm (10.2 in)
DRIVE CHAIN LUBRICATION
• Remove the chain clip and master link from the drive chain
and remove the drive chain.
NOTE:
Be careful not to bend the chain clip.
• Inspect for wear and damage of the drive chain and replace it
if necessary.
• Clean the drive chain with non-flammable cleaning solvent.
• Do not use gasoline to clean the drive chain.
• Dry the drive chain.
• Apply Suzuki Chain Lube or an equivalent to the link plates
and rollers.
• Reassemble the drive chain.
NOTE:
Reassemble the drive chain clip so the slit end faces opposite
the direction of rotation.
• Adjust the drive chain slack. (
above)
Direction of travel
Содержание RM85
Страница 1: ...Part No 99011 02B82 01A April 2006 EN TK RM85 L OWNER S SERVICE MANUAL ...
Страница 10: ... MEMO ...
Страница 42: ...3 TROUBLESHOOTING 3 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 3 2 ENGINE 3 2 CHASSIS 3 5 ...
Страница 47: ... MEMO ...
Страница 85: ...7 2 CLUTCH CONSTRUCTION CLUTCH 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 93: ...8 2 KICK STARTER CONSTRUCTION KICK STARTER ...
Страница 97: ... MEMO ...
Страница 99: ...9 2 GEARSHIFTING CONSTRUCTION GEARSHIFT LINKAGE 19 N m 1 9 kgf m 13 5 lb ft 23 N m 2 3 kgf m 16 5 lb ft ...
Страница 105: ...10 2 TRANSMISSION AND CRANKSHAFT CONSTRUCTION TRANSMISSION AND CRANKSHAFT 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 115: ... MEMO ...
Страница 117: ...11 2 FUEL SYSTEM CONSTRUCTION FUEL SYSTEM ...
Страница 121: ...11 6 FUEL SYSTEM REASSEMBLY Reverse the sequence of removal ...
Страница 123: ...12 2 COOLING SYSTEM CONSTRUCTION COOLING SYSTEM 2 5 N m 0 25 kgf m 1 8 lb ft 2 5 N m 0 25 kgf m 1 8 lb ft ...
Страница 141: ... MEMO ...
Страница 200: ...SERVICING INFORMATION 18 15 Radiator hose Throttle cable Clamp Clutch cable ...
Страница 205: ... MEMO ...