
2-8 PERIODIC MAINTENANCE
ENGINE COOLANT
ENGINE COOLANT LEVEL CHECK
• Remove the radiator cap
1
.
• Check that the engine coolant level is at the bottom of the inlet
hole. If not, replenish the radiator with specified engine cool-
ant.
• Tighten the radiator cap securely.
NOTE:
* This motorcycle does not have an overflow tank at the end of
breather hose. Therefore, engine coolant level may decrease
while riding. Check the engine coolant level every time before
riding.
* When replenishing engine coolant, be sure to use engine cool-
ant mixed with distilled water at the ratio of 50 : 50. Adding
only water will dilute engine coolant and it may decrease cool-
ing performance.
* If the motorcycle is to be exposed to temperatures below –31
°C (–24 °F), the percentage of antifreeze should be increased
to 55% or 60%, according to figure 1.
WARNING
You can be injured by scalding fluid or steam if you
open the radiator cap when the engine is hot.
Do not open the radiator cap when the engine is hot.
Wait until engine cools.
CAUTION
Improperly tightening the radiator cap will prevent the
cooling system from reaching the specified operating
pressure and will cause coolant overflow.
Tighten the radiator cap until it locks firmly.
Antifreeze density
Freezing point
50%
–31 °C (–24 °F)
55%
–40 °C (–40 °F)
60%
–55 °C (–67 °F)
Density (%)
Fig. 1 Engine coolant density-boiling point
F
reezing point
Содержание RM85
Страница 1: ...Part No 99011 02B82 01A April 2006 EN TK RM85 L OWNER S SERVICE MANUAL ...
Страница 10: ... MEMO ...
Страница 42: ...3 TROUBLESHOOTING 3 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 3 2 ENGINE 3 2 CHASSIS 3 5 ...
Страница 47: ... MEMO ...
Страница 85: ...7 2 CLUTCH CONSTRUCTION CLUTCH 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 93: ...8 2 KICK STARTER CONSTRUCTION KICK STARTER ...
Страница 97: ... MEMO ...
Страница 99: ...9 2 GEARSHIFTING CONSTRUCTION GEARSHIFT LINKAGE 19 N m 1 9 kgf m 13 5 lb ft 23 N m 2 3 kgf m 16 5 lb ft ...
Страница 105: ...10 2 TRANSMISSION AND CRANKSHAFT CONSTRUCTION TRANSMISSION AND CRANKSHAFT 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 115: ... MEMO ...
Страница 117: ...11 2 FUEL SYSTEM CONSTRUCTION FUEL SYSTEM ...
Страница 121: ...11 6 FUEL SYSTEM REASSEMBLY Reverse the sequence of removal ...
Страница 123: ...12 2 COOLING SYSTEM CONSTRUCTION COOLING SYSTEM 2 5 N m 0 25 kgf m 1 8 lb ft 2 5 N m 0 25 kgf m 1 8 lb ft ...
Страница 141: ... MEMO ...
Страница 200: ...SERVICING INFORMATION 18 15 Radiator hose Throttle cable Clamp Clutch cable ...
Страница 205: ... MEMO ...