
CLUTCH 7-5
• Replace the gasket with a new one.
• Install the dowel pins.
• Align the clutch release rack teeth with the pinion gear.
• Align the water pump empeller to the crankshaft end.
• Install the clutch cover.
• Tighten the bolts diagonally.
• Reassemble the rear brake pedal. (
15-14)
• Install the clutch release arm
1
.
• Install the kick starter lever
2
.
• Pour transmission oil. (
2-7)
• Pour engine coolant. (
2-8)
• Inspect the clutch cable play. (
2-9)
CLUTCH SLEEVE HUB REMOVAL
• Remove the pressure plate and clutch plates. (
7-3)
• Flatten the lock washer
1
.
• Hold the clutch sleeve hub with the special tool and loosen
the nut.
09920-53740: Clutch sleeve hub holder
• Remove the clutch sleeve hub
2
.
Содержание RM85
Страница 1: ...Part No 99011 02B82 01A April 2006 EN TK RM85 L OWNER S SERVICE MANUAL ...
Страница 10: ... MEMO ...
Страница 42: ...3 TROUBLESHOOTING 3 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 3 2 ENGINE 3 2 CHASSIS 3 5 ...
Страница 47: ... MEMO ...
Страница 85: ...7 2 CLUTCH CONSTRUCTION CLUTCH 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 93: ...8 2 KICK STARTER CONSTRUCTION KICK STARTER ...
Страница 97: ... MEMO ...
Страница 99: ...9 2 GEARSHIFTING CONSTRUCTION GEARSHIFT LINKAGE 19 N m 1 9 kgf m 13 5 lb ft 23 N m 2 3 kgf m 16 5 lb ft ...
Страница 105: ...10 2 TRANSMISSION AND CRANKSHAFT CONSTRUCTION TRANSMISSION AND CRANKSHAFT 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 115: ... MEMO ...
Страница 117: ...11 2 FUEL SYSTEM CONSTRUCTION FUEL SYSTEM ...
Страница 121: ...11 6 FUEL SYSTEM REASSEMBLY Reverse the sequence of removal ...
Страница 123: ...12 2 COOLING SYSTEM CONSTRUCTION COOLING SYSTEM 2 5 N m 0 25 kgf m 1 8 lb ft 2 5 N m 0 25 kgf m 1 8 lb ft ...
Страница 141: ... MEMO ...
Страница 200: ...SERVICING INFORMATION 18 15 Radiator hose Throttle cable Clamp Clutch cable ...
Страница 205: ... MEMO ...