MACHINE TUNING 4-15
NOTE:
When adjusting the damping setting, attempt turning the adjuster 1/4 to 1/2 turn at a time for each adjust-
ment.
SYMPTOM
SECTION
ADJUSTMENT PROCEDURE
Bottoms
• Jump
• Large bump
1. Adjust the compression damping to a harder
(H) setting. (See note below.)
2. Adjust the sag to a smaller measurement.
(closer to 85 mm)
3. Replace the spring with an optional stiffer one.
Kicks up
• Medium to large bumps
• Small to medium
bumps
• Decelerating or braking
1. Adjust the rebound damping to a harder (H) set-
ting. (See note below.)
2. Adjust the sag to a larger measurement. (closer
to 95 mm)
3. Replace the spring with an optional softer one.
Hits bumps too harshly
• Jump
• Large bump
• Series of medium
bumps
1. Adjust the compression damping to a softer (S)
setting. (See note below.)
2. Adjust the sag to a larger measurement. (closer
to 95 mm)
3. Replace the spring with an optional softer one.
Feels harsh and tends to
sink
• Series of medium
bumps
• Series of small bumps
1. Adjust the rebound damping to a softer (S) set-
ting. (See note below.)
Feels too soft and
unstable
• Series of medium
bumps
• Series of small bumps
1. Adjust the rebound damping to a harder (H) set-
ting.
Provides poor traction
• Accelerating
• Series of small bumps
1. Adjust the compression and rebound damping
to a softer setting, one at a time alternatively
until the optimum settings are obtained.
2. Replace the spring with an optional softer one.
Содержание RM85
Страница 1: ...Part No 99011 02B82 01A April 2006 EN TK RM85 L OWNER S SERVICE MANUAL ...
Страница 10: ... MEMO ...
Страница 42: ...3 TROUBLESHOOTING 3 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 3 2 ENGINE 3 2 CHASSIS 3 5 ...
Страница 47: ... MEMO ...
Страница 85: ...7 2 CLUTCH CONSTRUCTION CLUTCH 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 93: ...8 2 KICK STARTER CONSTRUCTION KICK STARTER ...
Страница 97: ... MEMO ...
Страница 99: ...9 2 GEARSHIFTING CONSTRUCTION GEARSHIFT LINKAGE 19 N m 1 9 kgf m 13 5 lb ft 23 N m 2 3 kgf m 16 5 lb ft ...
Страница 105: ...10 2 TRANSMISSION AND CRANKSHAFT CONSTRUCTION TRANSMISSION AND CRANKSHAFT 70 N m 7 0 kgf m 50 5 lb ft ...
Страница 115: ... MEMO ...
Страница 117: ...11 2 FUEL SYSTEM CONSTRUCTION FUEL SYSTEM ...
Страница 121: ...11 6 FUEL SYSTEM REASSEMBLY Reverse the sequence of removal ...
Страница 123: ...12 2 COOLING SYSTEM CONSTRUCTION COOLING SYSTEM 2 5 N m 0 25 kgf m 1 8 lb ft 2 5 N m 0 25 kgf m 1 8 lb ft ...
Страница 141: ... MEMO ...
Страница 200: ...SERVICING INFORMATION 18 15 Radiator hose Throttle cable Clamp Clutch cable ...
Страница 205: ... MEMO ...