3-12 ENGINE
• Remove the valve inspection caps. (F & R)
• Remove the intake pipes
6
. (F & R)
CYLINDER HEAD COVER
• Remove the valve timing inspection plug
1
and the generator
cover cap
2
.
• Position “R I T” line on the generator with the center of the
valve timing inspection hole.
• Remove the cylinder head cover. (Rear)
R
T
SA
MP
LE
Содержание Boulevard M50
Страница 1: ...VZ800 9 9 5 0 0 3 8 0 5 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE SAMPLE...
Страница 286: ...8 6 CHASSIS A Front axle B Brake disc bolt ITEM N m kgf m lb ft A 65 6 5 47 0 B 23 2 3 16 5 Left Right SAMPLE...
Страница 413: ...SERVICING INFORMATION 10 25 LUBRICATION POINTS 5 3 mm 2 1 in SAMPLE...
Страница 414: ...10 26 SERVICING INFORMATION FUEL TANK INSTALLATION 1 Cut after clamping 2 Frame Inside SAMPLE...
Страница 417: ...SERVICING INFORMATION 10 29 REAR FENDER CUSHION INSTALLATION 7 mm 0 28 in 13 5 mm 0 5 3 in SAMPLE...
Страница 418: ...10 30 SERVICING INFORMATION LEFT SIDE COVER INSTALLATION SAMPLE...
Страница 419: ...SERVICING INFORMATION 10 31 LID CUSHION INSTSALLATION 1 Cushion 2 10 mm 0 39 in 3 45 mm 1 77 in SAMPLE...
Страница 453: ...Prepared by December 2004 Part No 99500 38050 01E Printed in Japan 456 SAMPLE...
Страница 454: ......