FI SYSTEM 5-49
Step 1 (When indicating P0110-H:)
1) Loosen the inlet pipe screw. (
5-47)
2) Remove the air cleaner box. (
6-13)
3) Turn the ignition switch OFF.
4) Check the IAT sensor coupler for loose or poor contacts.
If OK, then check the IAT sensor lead wire continuity.
5) Remove the right frame cover. (
8-4)
6) Disconnect the IAT sensor coupler.
7) Remove the ECM bracket (
5-38) and ECM coupler.
8) Check the continuity between Dg wire
A
and terminal
2
.
9) Also, check the continuity between B/Br wire
B
and terminal
D
.
IATS lead wire continuity: Continuity (
)
09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
Tester knob indication: Continuity test (
)
Is the continuity OK?
10)After repairing the trouble, clear the DTC using SDS tool.
(
5-25)
1
1
]
ECM coupler (Harness side)
YES
Go to Step 2.
NO
Dg wire or B/Br wire open
SA
MP
LE
Содержание Boulevard M50
Страница 1: ...VZ800 9 9 5 0 0 3 8 0 5 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE SAMPLE...
Страница 286: ...8 6 CHASSIS A Front axle B Brake disc bolt ITEM N m kgf m lb ft A 65 6 5 47 0 B 23 2 3 16 5 Left Right SAMPLE...
Страница 413: ...SERVICING INFORMATION 10 25 LUBRICATION POINTS 5 3 mm 2 1 in SAMPLE...
Страница 414: ...10 26 SERVICING INFORMATION FUEL TANK INSTALLATION 1 Cut after clamping 2 Frame Inside SAMPLE...
Страница 417: ...SERVICING INFORMATION 10 29 REAR FENDER CUSHION INSTALLATION 7 mm 0 28 in 13 5 mm 0 5 3 in SAMPLE...
Страница 418: ...10 30 SERVICING INFORMATION LEFT SIDE COVER INSTALLATION SAMPLE...
Страница 419: ...SERVICING INFORMATION 10 31 LID CUSHION INSTSALLATION 1 Cushion 2 10 mm 0 39 in 3 45 mm 1 77 in SAMPLE...
Страница 453: ...Prepared by December 2004 Part No 99500 38050 01E Printed in Japan 456 SAMPLE...
Страница 454: ......