
5-70 FI SYSTEM
7) Remove the right frame cover. (
8-4)
8) Remove the ECM bracket (
5-38) and disconnect the
ECM coupler.
9) Check the continuity between W/Bl wire
A
and terminal
7
.
10)Also, check the continuity between B/Br wire
B
and terminal
D
.
HO2S lead wire continuity: Continuity (
)
09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
Tester knob indication: Continuity test (
)
Is the continuity OK?
11)After repairing the trouble, clear the DTC using SDS tool.
(
5-25)
Step 2 (When indicating C44/P0130:)
1) Connect the ECM coupler and HO2 sensor coupler.
2) Warm up the engine enough.
3) Insert the needle pointed probes to the HO2 sensor coupler.
4) Measure the HO2 sensor output voltage between W/Bl wire
A
and B/Br wire
B
, when idling condition.
HO2 sensor output voltage at idle speed:
0.2 V and less (
+
W/Bl
A
–
-
B/Br
B
)
5) If OK, then pinch the PAIR hose
1
with a proper hose clamp.
6) Measure the HO2 sensor output voltage while holding the
engine speed at 5 000 r/min.
HO2 sensor output voltage at 5 000 r/min:
0.7 V and more (
+
W/Bl –
-
B/Br)
09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
Tester knob indication: Voltage (
)
NOTE:
HO2 SENSOR VOLTAGE MEASURING CONDITION
1. 10 minutes after the engine start (Idling) or 100 sec. after the engine start (Engine revolution is over 2 000
r/min).
2. Coolant temperature is upper 45 ºC (113 ºF).
YES
Go to Step 2. (When indicating C44/P0130:)
NO
W/Bl wire shorted to ground, or W/Bl or B/Br wire
open
1
!
ECM coupler (Harness side)
2
V
2
SA
MP
LE
Содержание Boulevard M50
Страница 1: ...VZ800 9 9 5 0 0 3 8 0 5 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE SAMPLE...
Страница 286: ...8 6 CHASSIS A Front axle B Brake disc bolt ITEM N m kgf m lb ft A 65 6 5 47 0 B 23 2 3 16 5 Left Right SAMPLE...
Страница 413: ...SERVICING INFORMATION 10 25 LUBRICATION POINTS 5 3 mm 2 1 in SAMPLE...
Страница 414: ...10 26 SERVICING INFORMATION FUEL TANK INSTALLATION 1 Cut after clamping 2 Frame Inside SAMPLE...
Страница 417: ...SERVICING INFORMATION 10 29 REAR FENDER CUSHION INSTALLATION 7 mm 0 28 in 13 5 mm 0 5 3 in SAMPLE...
Страница 418: ...10 30 SERVICING INFORMATION LEFT SIDE COVER INSTALLATION SAMPLE...
Страница 419: ...SERVICING INFORMATION 10 31 LID CUSHION INSTSALLATION 1 Cushion 2 10 mm 0 39 in 3 45 mm 1 77 in SAMPLE...
Страница 453: ...Prepared by December 2004 Part No 99500 38050 01E Printed in Japan 456 SAMPLE...
Страница 454: ......