5-16 FUEL SYSTEM AND THROTTLE BODY
• Remove the throttle body assembly.
THROTTLE BODY DISASSEMBLY
• Disconnect the respective vacuum hoses
1
from each throttle
body.
• Remove the IAP sensor
2
• Remove the fuel delivery pipe assembly
3
.
• Remove the cushion seal
4
from the throttle body.
• Remove the fuel injectors
5
, from the fuel delivery pipe
6
.
Identify the position of each removed part. Organize
the parts in their respective groups so that they can be
reinstalled in their original positions.
Содержание 2006 gsxr 600
Страница 1: ...GSX R750 9 9 5 0 0 3 7 1 3 0 0 1 E ...
Страница 48: ...PERIODIC MAINTENANCE 2 31 ...
Страница 101: ...3 48 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft ...
Страница 154: ...ENGINE 3 101 10 N m 1 0 kgf m 7 0 lb ft ...
Страница 324: ...7 20 COOLING AND LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ...
Страница 325: ...COOLING AND LUBRICATION SYSTEM 7 21 ...
Страница 487: ...10 28 SERVICING INFORMATION SEAT LOCK CABLE ROUTING REAR FENDER INSTALLATION ...
Страница 521: ...Prepared by December 2005 Part No 99500 37130 01E Printed in Japan 524 ...
Страница 522: ...Printed in Japan K6 ...