![Surefire iBURNER BMS-100 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/surefire/iburner-bms-100/iburner-bms-100_installation-and-operation-manual_1406992022.webp)
22
Ignition Process with out Daughter Board
1) Press the ON Button
2) Pre-purge - Pre-purge countdown displayed.
Green LED ON.
3) Audible Alarm - 5 second countdown displayed.
Green LED ON.
4) Igniter - 8 second countdown displayed.
Green LED ON
5) Solenoid valve opens - Igniter remains on for another 5 seconds.
Green LED ON.
6) Ignition is achieved and a 30 second flame proof timing begins. Pilot ignites.
Green LED ON.
7) Flame is sensed, flame proof timing countdown expires, the display reads “On” (Status code 00).
Green
LED ON.
8) 30 second timer begins before actuator valve opens (count down not visible).
9) After 30 seconds the actuator valve opens.
Re-Ignition Process - Flame Out
1) Once the system recognizes that no flame is sensed, the system will automatically begin the re-ignition
process.
2.
Reference step 2 - 7 in the “Ignition Process Section”
Re-Ignition Process - Standby
1) System in standby.
Blinking Green LED.
2) Once the System resolves the Standby issue, the system will automatically begin the re-ignition process
3)
Reference step 2- 7 in the “Ignition Process Section”
Re-Ignition Process - Shutdown
1) The System requires manual reset in the event of a shutdown
2) System in shutdown.
Blinking Red LED.
3) Once the Shutdown issue has ben resolved, press the OFF button then ON button to reset.
4)
Reference step 2 - 7 in the “Ignition Process Section”
OPERATIONS GUIDE - SEQUENCE OF OPERATION
Содержание iBURNER BMS-100
Страница 1: ...Proudly Made in the USA INSTALLATION OPERATIONS MANUAL PROUDLY MADE IN THE USA...
Страница 16: ...16 INSTALLATION WIRING DIAGRAM...
Страница 17: ...17 1 SureFire Solenoid Fuel Train 1 SOLENOID FUEL TRAIN...
Страница 18: ...18 1 SureFire Solenoid Actuator Fuel Train 1 SOLENOID ACTUATOR FUEL TRAIN...
Страница 19: ...19 1 4 ASCO Solenoid 3PG Valve Actuator Fuel Train 1 4 SOLENOID 3PG ACTUATOR FUEL TRAIN...
Страница 23: ...23 Flowchart without Daughter Board OPERATIONS GUIDE FLOW CHART...
Страница 25: ...25 Flowchart with Safety T C Daughter Board installed OPERATIONS GUIDE FLOW CHART...
Страница 27: ...27 Flowchart with Daughter Board Safety T C and 4 20mA Input OPERATIONS GUIDE FLOW CHART...