SC826 Chassis Manual
5-2
5-3 Warnings and Precautions
Rack Precautions
•
Ensure that the leveling jacks on the bottom of the rack are fully extended to
the floor with the full weight of the rack resting on them.
•
In single rack installations, stabilizers should be attached to the rack.
•
In multiple rack installations, the racks should be coupled together.
•
Always make sure that the rack is stable before extending a component from
the rack.
•
Only one chassis should be extended from the rack at a time. Extending two or
more chassis simultaneously may cause the rack to become unstable.
General Server Precautions
•
Review the electrical and general safety precautions that came with the
components you are adding to your chassis.
•
Determine the placement of each component in the rack
before
you install the
rails.
•
Install the heaviest server components on the bottom of the rack first, and then
work upward.
•
Use a regulating uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a
power failure.
•
Allow the hot-swappable hard drives and power supply modules to cool before
touching them.
•
Always keep the rack's front door and all panels and components on the servers
closed when not servicing to maintain proper cooling.
Содержание SC826 Series
Страница 12: ...SC826 Chassis Manual 1 6 Notes ...
Страница 56: ...SC826 Chassis Manual 4 18 Figure 4 16 Placing the System Fan in the Chassis 3 5 ...
Страница 60: ...SC826 Chassis Manual 4 22 Notes ...
Страница 72: ...SC826 Chassis Manual A 4 Notes ...
Страница 84: ...C 10 SC826 Chassis Manual Notes ...
Страница 94: ...D 10 SC826 Chassis Manual Notes ...
Страница 134: ...F 18 SC826 Chassis Manual Notes ...
Страница 145: ...G 11 Appendix G Cascading Configurations Notes ...