Premier VS Infrared Heating System
Page 49
June 04, 2014
INSTALLATION -
Part 2
C
- Additional Pump Connections & Equipment
1.
Connect the Reducer to the end of the Common Tailpipe using a 4” Butt Joint Clamp. Ensure a minimum
of 2" (5 cm) clearance between the Reducer and the Pump Inlet.
2.
Install the Flexible Boot Connector between the Reducer and Pump Inlet, to reduce vibration and noise
transmission, using a gear clamp at either end, as shown in Figure 35.
3.
Seal all joints and seams using high temperature Silicone Sealant (RTV Silicone).
4.
Where condensing designs are specified, a Condensate Drain may be installed as shown in Figure 36.
Ensure connection to Drain Pipe is flexible to allow for system movement / expansion during operation, and
that an appropriate Neutralization Device is installed as required.
Figure 36: Condensate Drain Detail - Optional
Figure 35: Tailpipe to Vacuum Pump Connections
Air
Fl
ow
Di
rec
tio
n
4" Ø: VS010
6" Ø: VS048
(6" Ø shown)
4" Common
Tailpipe
Vacuum Switch
6" To 4" Reducer
Package
Vibration Boot
Butt Joint
Clamp
VE007
CT048
CR046
1/2"
To D
rain
or N
eutr
aliza
tion
Dev
ice
Air
Fl
ow
Di
rec
tio
n
Condensate Trap
VH004
6" to 4" Reducer
w/ Vacuum Switch
VE007