Premier VS Infrared Heating System
Page 25
June 04, 2014
INSTALLATION -
Part 1
2.
Install an End Vent Cap at the beginning of each Branch (open end of the first Combustion Tube) and fasten
it with a #8 x 3/8” screw as shown in Figure 11 below.
Figure 11: End Vent Cap Orientation
Concrete Beam
Beam Clamp
Turnbuckle
24"
Min.
3/8"
Threaded
Rod
I-Beam
I-Beam
Anchor
12"
Min.
"S" Hook
Note:
Close all "S" Hooks,
Turnbuckles, "J" Bolts.
12"
Min.
Truss
Eye Bolt
Figure 10: Ceiliing Mounting / Hanging Options
#8 x 3/8" Screw
Air F
low
Dire
ctio
n
Make sure 1/4" hole is in
the 12 o'clock position
relative to the
Combustion Tube and
Burner, then secure to
the Tube with a screw.
End Vent Cap
VS016