Installation
A general ordered sequence for installation is provided below for reference.
Figure 7: General Overview of Installation
H
ANGERS
I
NSTALLATION
•
Suspension mechanism must allow for lateral tubing expansion. A minimum 12" inch length
welded link chain with a working load limit of at least 200 lbs. is recommended (refer to Figure 8
for more details).
Close all open ended S hooks and turnbuckles to avoid unhooking chain
with inadvertent contact.
•
Locate hanging chain at predetermined suspension points in the structure.
It is required that the
first 2 hangers
be about 8' feet to 9' feet away. Thereafter, 10' feet apart on average is acceptable
for the remainder of the heat exchanger. At no time should hangers be more than 12' feet apart,
(see Figure 9).
Tube & Reflector
Hangers
Install Baffle
as required in
last section
of tube
Heat
Exchanger
Tube
Tube
Coupling
Vent
Adapter
Bend Tab
over End
of Tube
Reflector
Support
Loose
Screws
Tight
Screws
Reflector
End Cap
Loose
Screws
Install "J" Bolt
at first hanger
Tube
Flange
Gasket
3"
Combustion
Tube
Tight
Screws
Burner
Assembly
Reflector Overlap
Approx. 8"
Fasten Endcap
with Screws
In 100,000 BTU systems, place 4' baffles in
the last 3 ten foot tube lengths as shown.