Series
LTA/LTX/LTXR
Page
19 Nov./21/12
Installation
•
A general overall view of the tubes and reflector hangers are shown in Figure below
Figure 15: Overall view of Tubes and Reflector Hangers
Tube & Reflector
Hangers
Install Baffle
as required in
last section
of tube
Heat
Exchanger
Tube
Tube
Coupling
Vent
Adapter
Bend Tab
over End
of Tube
Install "J" Bolt
at first hanger
Tube
Flange
Gasket
3"
to
6"
Combustion
Tube
Burner
Assembly
Tube
Coupling
10' Flanged
Tube
8' - 9'
Locate Tube and
Reflector Hangers
every 10' thereafter.
*Note: (30' system shown
here, the same principle
should be followed for 40', 50'
systems or more)
Refer to Installation Sequence
for more details.
10' Tube
10' Tube