![Sunways AT 2700 Скачать руководство пользователя страница 99](http://html1.mh-extra.com/html/sunways/at-2700/at-2700_user-manual_1401168099.webp)
99
Direct Ethernet connection
PC
Main unit
Secondary unit
Max. Ethernet
connection: 100 m
Max. total CAN bus
length: 100 m
IN
V
ER
TE
R
IN
V
ER
TE
R
6.3 Direct Ethernet connection
The solar inverters are equipped with an
Ethernet interface as standard for system
monitoring and configuration with a PC.
Connect your PC and the solar inverter
with a crossed or 1:1 Ethernet connec-
tion cable of the type CAT5 with RJ45
sockets (automatic detection) or with the
included Ethernet cable.
The PC is connected to the main unit as
standard.
To always find the suitable configuration
for installation and commissioning on the
PC, we recommend the use of a second
network card (e.g. PCBus, PCMCIA),
which you can configure to match the de-
fault setting of the solar inverter.
The PC and the solar inverter must have
suitable IP addresses and net masks. The
network settings can be adjusted wither
directly on the solar inverter via the LCD
display or on your PC.
Содержание AT 2700
Страница 1: ...User Manual for Sunways Solar Inverter AT 5000 AT 4500 AT 3600 AT 2700...
Страница 8: ...1 0 Product Description...
Страница 16: ...16 2 0 Safety precautions...
Страница 22: ...22 3 0 Installation...
Страница 46: ...46 4 0 Commissioning...
Страница 56: ...56 5 0 Operation...
Страница 96: ...96 6 0 System monitoring...
Страница 103: ...103 4 Click in the Status window on Properties 5 Mark Internet Protocol TCP IP and click on Properties again...
Страница 129: ...129...
Страница 130: ...130 7 0 Appendix...
Страница 135: ...135 Efficiency of AT 5000 Output power W...
Страница 136: ...136 Efficiency of AT 4500 Output power W...
Страница 137: ...137 Efficiency of AT 3600 Output power W...
Страница 138: ...138 Efficiency of AT 2700 Output power W...
Страница 140: ......
Страница 141: ...C F Werbung und Dokumentation Villingen Schwenningen www cundf de...