6
4.2 Commissioning
49
Commissioning single unit
50
Commissioning several
networked units
52
Later commissioning
55
5.0 Operation
56
5.1 Operating elements
57
Operating field
57
LCD display
57
Operating LED
58
Standard screen (single unit)
59
Standard screen (system)
60
5.2 Access rights
61
5.3 Menu structure
62
Instantaneous Values – Unit
63
5.4 Overview of screen displays
63
Events – Unit
64
History – Unit
65
Information – Unit
66
Instantaneous values – Solar
system
67
Yields – Solar system
67
Events – Solar system
68
History – Solar system
68
System info – Solar system
69
Settings – General
70
Settings – Login
71
Settings – Network
72
5.4 Malfunction displays
73
6.0 System monitoring
96
6.1 General information
97
6.2 Integrated data logger
98
6.3 Direct Ethernet connection
99
6.4 Network settings on solar
inverter
100
6.5 Network settings on PC
101
6.6 Connection via an existing
Ethernet network
105
6.7 Connection via Internet
107
6.8 Connection via Sunways
Modem
108
6.9 Dialling in from a PC to solar
inverter
109
6.10 Sunways Browser
114
General information
114
Access protection
115
Overview – Menu
116
Language selection
116
Содержание AT 2700
Страница 1: ...User Manual for Sunways Solar Inverter AT 5000 AT 4500 AT 3600 AT 2700...
Страница 8: ...1 0 Product Description...
Страница 16: ...16 2 0 Safety precautions...
Страница 22: ...22 3 0 Installation...
Страница 46: ...46 4 0 Commissioning...
Страница 56: ...56 5 0 Operation...
Страница 96: ...96 6 0 System monitoring...
Страница 103: ...103 4 Click in the Status window on Properties 5 Mark Internet Protocol TCP IP and click on Properties again...
Страница 129: ...129...
Страница 130: ...130 7 0 Appendix...
Страница 135: ...135 Efficiency of AT 5000 Output power W...
Страница 136: ...136 Efficiency of AT 4500 Output power W...
Страница 137: ...137 Efficiency of AT 3600 Output power W...
Страница 138: ...138 Efficiency of AT 2700 Output power W...
Страница 140: ......
Страница 141: ...C F Werbung und Dokumentation Villingen Schwenningen www cundf de...