5. CAN network list is set up
Depending on the side of the network, it
may take a moment until the main unit
has found all secondary units and added
them to the list.
Units = total number of devices found
in CAN network
In network = number of configured
units
After the main unit has found all con-
nected secondary unit, these must be
configured before commissioning of
the main unit is continued.
4. Set data and time centrally for all
connected units.
Please note that time settings should only
be made with caution, as they directly af-
fect data logging. For example, if you set
the time back by 1 hour, then the existing
data will be overwritten.
Select time with
. Change selected
number with
/
and jump to next
number with
/
.
Apply set time with
and set date in
same way as time.
Apply set date with
.
Содержание AT 2700
Страница 1: ...User Manual for Sunways Solar Inverter AT 5000 AT 4500 AT 3600 AT 2700...
Страница 8: ...1 0 Product Description...
Страница 16: ...16 2 0 Safety precautions...
Страница 22: ...22 3 0 Installation...
Страница 46: ...46 4 0 Commissioning...
Страница 56: ...56 5 0 Operation...
Страница 96: ...96 6 0 System monitoring...
Страница 103: ...103 4 Click in the Status window on Properties 5 Mark Internet Protocol TCP IP and click on Properties again...
Страница 129: ...129...
Страница 130: ...130 7 0 Appendix...
Страница 135: ...135 Efficiency of AT 5000 Output power W...
Страница 136: ...136 Efficiency of AT 4500 Output power W...
Страница 137: ...137 Efficiency of AT 3600 Output power W...
Страница 138: ...138 Efficiency of AT 2700 Output power W...
Страница 140: ......
Страница 141: ...C F Werbung und Dokumentation Villingen Schwenningen www cundf de...