83
Malfunction
Description
Remedies
212:DC share
Your solar inverter continually
monitors the quality of current
fed in. If an increased DC share
is found in the current fed in,
the solar inverter stops feed-
ing. The solar inverter does not
attempt to feed in again until
after a reset (the next day).
➡
Restart the solar inverter.
If the error still occurs, please
contact the technical hotline.
The phone number is provided
on the back of the manual.
213:UAC1>10%
(Warning)
The voltage of the phase
feeding in is higher than 10%
above the nominal value. If
this is the case for longer than
ten minutes, the inverter stops
feeding and does not switch on
again until the voltage drops
below this limit again.
The cable cross-section in the
AC supply line to the solar
inverter is too small.
Your PV system feeds into a
spur line, which is insufficiently
dimensioned.
➡
Ask your power supply
company (PSC) about grid
stability and design.
➡
Check the design of your
grid connection (energy
meter) or the grid feed point
to your Electric Utility.
83
Malfunction
Description
Remedies
301:AFI-Over
The integrated sensor for
measuring the residual current
has been operated outside its
measuring range.
A residual current was detected
during start-up.
➡
Restart the solar inverter.
If the error still occurs, please
contact the technical hotline.
The phone number is provided
on the back of the manual.
302:Monit.
The AT solar inverter is
equipped with a redundant
monitoring unit which con-
stantly checks the measured
values of the controller for
plausibility. If a deviation or an
error is detected in the process,
this message appears. In addi-
tion, this message can also ap-
pear in case of a power failure.
➡
Restart the solar inverter.
If the error still occurs, please
contact the technical hotline.
The phone number is provided
on the back of the manual.
Содержание AT 2700
Страница 1: ...User Manual for Sunways Solar Inverter AT 5000 AT 4500 AT 3600 AT 2700...
Страница 8: ...1 0 Product Description...
Страница 16: ...16 2 0 Safety precautions...
Страница 22: ...22 3 0 Installation...
Страница 46: ...46 4 0 Commissioning...
Страница 56: ...56 5 0 Operation...
Страница 96: ...96 6 0 System monitoring...
Страница 103: ...103 4 Click in the Status window on Properties 5 Mark Internet Protocol TCP IP and click on Properties again...
Страница 129: ...129...
Страница 130: ...130 7 0 Appendix...
Страница 135: ...135 Efficiency of AT 5000 Output power W...
Страница 136: ...136 Efficiency of AT 4500 Output power W...
Страница 137: ...137 Efficiency of AT 3600 Output power W...
Страница 138: ...138 Efficiency of AT 2700 Output power W...
Страница 140: ......
Страница 141: ...C F Werbung und Dokumentation Villingen Schwenningen www cundf de...