background image

                                                                      Specification of excellent controller 

                                                                                                               

Page - 17 - 

NOTE: 
1.

 

When solar module voltage goes below the point of NTTV (Night Time Threshold 
Voltage) at sunset, the solar controller will recognize the starting voltage and turn 
on the load after 1 minutes delay. 

2.

 

When  solar  module  voltage  goes  above  point  of  DTTV  (Day  Time  Threshold 
Voltage),  the  solar  controller  will  recognize  the  starting  voltage  and  turn  off  the 
load after 1 minutes delay. 

 

3.

 

We set NTTV equal to DTTV, by ‗VsTH‘ this parameter to adjust.     

 
T1-X mean 1th line output, T2-X mean 2

nd

 line output

for example T1-X

 

 

T1-1 

default is 5 , mean full-power time is 5hours,then go intoT1-2 step. 

 

T1-2 

default is 0 ,  mean  half- power time is  0hours,then  go intoT1-3 step 

directly. 

 

T1-3 

default value be 5 , mean turn off time is 5hours,then go intoT1-4 step. 

 

T1-4 

this process is balance of whole night time. And turn off lamp while 

dawn.  This  value  would  not  show  on  LCD,  so  this  value  is  not 
adjustable. Of course , you could to cover this process by -2,-3 value 
with longer time. 

 

12.2

 

DC output constant (MODE

C

 

Such  so  mode  control  way  is  for  monitor  system  .On  this  mode,  related 
street lighting function will be shut-down. DC power will be output constant 
with 24hours. 

 

13.    About time-delay illumination   

Delay  items 

Duration 

Power up DC output (lighting) 

60 seconds approximately 

Dusk to light lamp (NTTV) for output 

60 seconds approximately 

Dawn to turn-off lamp (DTTV) for output 

60 seconds approximately 

Over-charge protection on charge 

10 seconds approximately 

Over-charge recovery on charge 

15 minutes approximately 

Over-discharge cut-off output 

10 seconds approximately 

Over-discharge recovery for output 

2 minutes approximately 

Loading  abnormally  output  DC  power 

2 minutes approximately 

Wind-turbine  brake 

1 hours approximately 

 

Содержание SSWC-06-1224-TA

Страница 1: ...el No SSWC 06 1224 TA Version 5 0 Thank you very much for selecting our product This manual offers important information and suggestions with respect to installation use and troubleshooting etc Please...

Страница 2: ...ller 5 Step 1 Battery Wiring 5 Step 2 Loading Wiring 6 Step 3 Solar Module Wiring 7 Step 4 Wind turbine PMG Wiring 7 Step 5 Switch power wiring 8 Step 6 Accessories Option 8 Step 7 Confirmation for Wi...

Страница 3: ...er than controller rating accordingly 2 General Safety Information Please don t use low quality battery to avoid leakage rust or burn Please don t use thin or low quality cable to avoid leakage or fir...

Страница 4: ...light sensor voltage timer and so on 5 Protection Functions Solar cells reverse charging solar cells anti reverse connection Battery over charging over discharge battery anti reverse connection Over...

Страница 5: ...er the controller Loose power connections and or corroded wires may result in resistive connections that melt wire insulation burn surrounding materials or even cause fire Ensure tight connections and...

Страница 6: ...h the drilled holes in step 4 Secure the controller in place using the mounting screws 8 3 System connection with controller NOTE A recommended connection sequence has been provided for maximum safety...

Страница 7: ...ce will provide battery voltage to the loads DC loading could be LED lamp or monitor devices etc 1 Connect load1 positive and negative to the controller related terminals and connect load2 positive an...

Страница 8: ...ause severe shock or injury Cover the solar module s from the sun before installing solar wiring CAUTION 1 If you can not confirm the scientific and rational PV module connection by series or parallel...

Страница 9: ...e 2 wires from controller need connect to switch power Red wire is positive Black wire is negative polarity 2 Please make sure connection are correct with switch power related terminals 3 Switch power...

Страница 10: ...power terminals are tightened Step 8 Power up sequence after confirmation of connection 1 Turn on battery firstly 2 Turn on solar panel 3 Turn on wind turbine 4 Turn on DC loading 5 Turn on switch po...

Страница 11: ...ne 1 minute delay 4 If battery voltage lower than over discharge point no DC power output 5 As street lighting system while solar panel voltage higher than threshold voltage controller no DC power out...

Страница 12: ...batteries Eb mean power volume of battery with percent format Uw meaning voltage of wind turbine but this value is DC voltage which be rectified voltage from wind turbine output Iw charging current f...

Страница 13: ...d abnormal is troubleshooting the screen will automatically back to first browsing page content If the wind turbines in the brake protection status the screen display Tip Once the wind turbine brake a...

Страница 14: ...the value each press means increase or reduce 0 1V Press ENTER to choose 11 3 Press ENTER key to next page Press key or key to adjust the number each press means increase or reduce 0 1V If set time ea...

Страница 15: ...ill showing is 12v it was rectified value wind turbine output approximate 10vac 12v system will showing6 0v wind turbine output approximate 6vac Press key or key to adjust the number each press means...

Страница 16: ...battery to power up controller This is intent to make sure the program running in you done modified setting condition PLEASE MAKE SURE NO CONNECTIION WITH WIND TURBINE AND SOLAR PANEL BEFORE SETTING...

Страница 17: ...toT1 4 step T1 4 this process is balance of whole night time And turn off lamp while dawn This value would not show on LCD so this value is not adjustable Of course you could to cover this process by...

Страница 18: ...ischarge Recovery Voltage 12V 24V 12 0V 24 0V adjustable Over charge Voltage 12V 24V 15 0V 30 0V adjustable Over charge Recovery Voltage 12V 24V 13 5V 27 0V adjustable 14 4 Output Set up function Each...

Страница 19: ...rminals Inspect for loose broken or burnt wire connections Check and confirm that LCD is consistent with required Pay attention to any troubleshooting or error indication Take necessary corrective act...

Страница 20: ...battery 2 Connected to the battery the controller does not output The battery voltage is below the release point Normal wait for the system to charge to the recovery point Access photovoltaic panels s...

Страница 21: ...1 Damage by accident negligence abuse or improper use 2 PV or load current exceeding the rating of product 3 Unauthorized product modification attempted repair 4 Damage occurring during shipment 5 Dam...

Отзывы: