OPERATION & MAINTENANCE MANUAL SWE215F
41
2.1.5 Tying Down the Machine
Note
Secure the chains or slings to the machine
frame. Do not place the chains and slings across
or press on the hydraulic piping or hoses.
When placing the machine on the specified position of
the trailer, fold working equipment to transportation
configuration, lower the boom, place an wooden block
under bucket cylinder to prevent damages to it during
transportation.
Pull the pilot safety lever to LOCK position, stop the
engine, remove engine starting key, and lock the cab
door securely.
Chock the front and rear position of the track to
prevent machine movement during transportation.
Fix the four corners of the machine and front
accessories to the trailer with chains or wire ropes.
Raise the ramp located on the rear part of the trailer
then fix it.
2.1.6 Unloading
Note
Load the machine only on firm, level ground
and keep a safe distance with the road shoulder.
Chock the machine to prevent the machine
movement during loading process.
The ramp for loading must have enough
strength and width with an maximum slope of
15
°
, be sure both side of the ramp is at equal
level so that machine could travel safely.
In case of cold weather, fully warm up the
machine.
Unloading procedure
Switch off idle speed function, set travel speed to low
speed position, adjust engine throttle knob to set
engine speed at low speed.
Содержание SWE215F-5
Страница 137: ...OPERATION MAINTENANCE MANUAL SWE215F 130 4 4 10 Hoses...
Страница 170: ...OPERATION MAINTENANCE MANUAL SWE215F 163 5 TECHNICAL SPECIFICATION...
Страница 174: ...OPERATION MAINTENANCE MANUAL SWE215F 167 5 1 4 SWE215F 5 Electrical Schematic...
Страница 176: ...OPERATION MAINTENANCE MANUAL SWE215F 169 5 1 6 SWE215F 5 Hydraulic Schematic...
Страница 178: ...OPERATION MAINTENANCE MANUAL SWE215F 171 6 NOTE FOR SAFETY...