
OPERATION & MAINTENANCE MANUAL SWE215F
96
allowed to operate. If no, find out the problem and do
not operate until the problem is cleared. You could
stop the engine to help find the problem if necessary.
3.4.6 New Machine Running-in
Note
All machines have a running-in period. The running-in period of our machines is the first 50
hours.
How well does the machine run during running-in period have direct effect on the machine
performance in the future in terms of use effect and service life. Please follow the rules
specified in this manual.
After starting the engine, do not attempt any operation; allow it to idle for 15 seconds.
After idle running, attempt all digging, swing action without load at idle speed for 5 minutes.
Do not operate with heavy load or at high speed.
Before stopping the engine, do keep it running at idle for longer than 2 minutes.
Do not start, accelerate, steer, travel and attempt all other actions sharply, except in emergency.
Содержание SWE215F-5
Страница 137: ...OPERATION MAINTENANCE MANUAL SWE215F 130 4 4 10 Hoses...
Страница 170: ...OPERATION MAINTENANCE MANUAL SWE215F 163 5 TECHNICAL SPECIFICATION...
Страница 174: ...OPERATION MAINTENANCE MANUAL SWE215F 167 5 1 4 SWE215F 5 Electrical Schematic...
Страница 176: ...OPERATION MAINTENANCE MANUAL SWE215F 169 5 1 6 SWE215F 5 Hydraulic Schematic...
Страница 178: ...OPERATION MAINTENANCE MANUAL SWE215F 171 6 NOTE FOR SAFETY...